Laserfiche WebLink
SECTION 01 11 00 (Revision No. 2) <br />SUMMARY OF WORK <br />PART 1 GENERAL <br />1.01 WORK COVERED BY CONTRACT DOCUMENTS <br />A. Project Name: Indian River County North RO Plant Roof Replacement <br />B. Project Address: 7751 58th Street, Vero Beach, Florida, 32967 <br />C. Owner: Indian River County <br />D. Engineer: The Contract Documents, dated December 18, 2018, were prepared by REI <br />Engineers, Inc. <br />E. This work includes the provision of all labor, material, equipment, supervision and <br />administration to integrate the work outlined in this project manual into the total building <br />system such that no leakage into the system occurs. In general, the scope of work in the <br />Base Bid will include: <br />1. Roof Sections A, B & C: (Approximately 11,713 square feet): Remove and <br />dispose of the existing roof system including flashings and sheet metal down to the <br />existing structural deck; resecure the existing edge nailers and gutters to remain in <br />place; adhere vapor barrier; adhere polyisocyanurate insulation system, provide <br />adhere gypsum coverboard, fully adhere felt -back thermoplastic single ply <br />membrane along with flashings and accessories and accessories and provide sheet <br />metal flashings and trim to provide a complete, watertight, 20 -year warrantable <br />roof assembly. <br />2. Roof Sections D & E: (Approximately 6,785 square feet): Remove and dispose <br />of the existing roof system including flashings and sheet metal down to the existing <br />structural deck; resecure the existing edge nailers to remain in place; install wall <br />scupper drains, repair wall at abandoned scupper locations; install new counter <br />flashing; adhere vapor barrier; adhere polyisocyanurate insulation system, provide <br />adhere gypsum coverboard, fully adhere felt -back thermoplastic single ply <br />membrane along with flashings and accessories and accessories and provide sheet <br />metal flashings and trim to provide a complete, watertight, 20 -year warrantable <br />roof assembly. <br />3. Roof Sections F: (Approximately 1,465 square feet): Remove and dispose of the <br />existing roof system including flashings and sheet metal down to the existing <br />structural deck; resecure the existing edge nailers to remain in place; install wall <br />scupper drains; repair wall at abandoned scupper locations; install new counter <br />flashing; adhere vapor barrier; adhere polyisocyanurate insulation system, provide <br />adhere gypsum coverboard, fully adhere felt -back thermoplastic single ply <br />membrane along with flashings and accessories and provide sheet metal flashings <br />and trim to provide a complete, watertight, 20 -year warrantable roof assembly. <br />4. Remove the existing lightning protection/grounding system prior to <br />commencement of roof replacement work. Upon completion of flashing and sheet <br />metal installation, all new or existing parts, components or materials will be <br />reinstalled or installed to meet UL requirements at the time of initial installation. <br />F. Asbestos Containing Roofmg Materials (ACRM): <br />Indian River County North RO Plant <br />Roof Replacement 01 11 00-1 (Revision No. 2) <br />Summary of Work <br />