My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-060A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-060A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:32:59 PM
Creation date
5/20/2019 1:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC North RO Flant <br />February 14, 2019 <br />**proposa/ based on plans dated 12/28/19REI Enqineerinq. Addendums 1-7 INCLUDED <br />Sarnafll PVC Specifications <br />1. Remove existing roofing down to structural deck. Haul away all roofing trash and debris from jobsite. <br />2. Install Poly -ISO board and 1/2" DensDeck coverboard set in two-part foam adhesive. NOTE: Roof Sections <br />A,B,C & F to receive 1.5" ISO. Sections D&E to receive 4" ISO. <br />3. Install Sarnafil G410-15 60mil EnergySmart Fleeceback membrane fully adhered to coverboard with Water <br />based adhesive. All aps to be fully heat welded. <br />4. All walls curbs and roof penetrations to be flashed in accordance with Sarnafil Warranty requirements. <br />S. Furnish and install NEW Aluminum spun retrofit roof and overflow drains. Existing overflow drains to be <br />modified in accordance with REI requirements. <br />6. nstall Sarnafit PVC Expansion Joint cover as required. <br />7. Install PT Wood biocking as required. <br />8. Fabricoteand|nstaUNEVVSarnaOad^VVH(TE"dhpedOewithmombranefuUyheatwe|dedtoflange. <br />9. Fabricate and install NEW .032 Aluminum "WHITE" surface mounted counter flashings. <br />10. Fabricate and install NEW 24ga. Galvalume coping cap at parapet wall locations. NOTE: Color to match <br />existing as clo5e as possible from current suppliers. <br />11. MECHANICAL: Furnish and install (1) NEW curb at existing RTU. <br />12. LIGHTNING PROTECTION: Existing lightning protection to be removed and re -installed. <br />13. Provide Sika Sarnafil 2Oyr System warranty upon completion. <br />14. Provide Vero Beach Roofing 5yr Workmanship Warranty upori completion. <br />Roof System: $230,740.00 <br />Lighting Protection: $5l00.0Q <br />Forced Account: <br />TOTAL Bid Amount: $205,740.00 <br />ir accordarice with your instructions, we are pleased to submit our quotation for the above refrenced project. <br />We propose to furnish and install all labor and material, and necessary equipment to complete the work in full <br />compliance with the preparation and application standards specifically Iisted above. We request the opportunity to <br />discuss any possible changes or adjustments that would promote a contract award. <br />Best Regards, <br />Dale Bischoff <br />Estimator/Project Manager <br />Vero Beach Roofing <br />The prices, specifications and conditions are satisfactory and are hereby accepted. Payment terms to be set. <br />Representative of Vero Beach Roofinri: Date: <br />Customer Signature: Date: <br />Vero Beach Roofing Inc. <br />835 10th Ave SW Vero Beach, Fl 32962 (772) 770-3782 Fax: (772) 564-0894 <br />"Quality Begins By Choosing The Right Contractor" <br />
The URL can be used to link to this page
Your browser does not support the video tag.