My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-060A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-060A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:32:59 PM
Creation date
5/20/2019 1:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 3205 PG: 1918 <br />Bid No. 2019031/19C-1802 <br />PUBLIC CONSTRUCTION BONO <br />gond No, OFB5143675 <br />(enter bond numbed <br />BY THIS BOND, We Vero Beach Roofing, Inc. , as Principal andOld Republic Surety Company a <br />corporation, as Surety, are bound to Indian Rivier County , herein called Owner, in the sum of <br />$$285,740.00 . for payment of which we bind ourselves, our heirs, personal representatives, successors, and <br />assigns, jointly and severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract datedAP 9 2019 between Principal and Owner for construction ofNorth County RO Plant <br />Roof Replacement- IRC 1809 • the contract being made a part of this bond by reference, at the times and in <br />the manner prescribed in the contract and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying <br />Principal with labor, materials, or supplies, used directly or indirectly by Principal in the prosecution of the work <br />provided for in the contract and <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that <br />Owner sustains because of a default by Principal under the contract and <br />4. Performs the guarantee of all work and materials fumished under the contract for the time specified in the <br />contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a daimant under this bond for payment must be in accordance with the notice and time <br />limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance with any formalities <br />connected with the contract or the changes does not affect Surety's obligation under this bond. <br />DATED ON May 3, 2019 Vero Beach Roofing, Inc. <br />s ! I � ...I. 1. <br />(As Attorney in F . ct) Checree Bryant <br />Old Republic Surety Company <br />(Name of Surety) <br />Page 39 of 41 <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />
The URL can be used to link to this page
Your browser does not support the video tag.