Laserfiche WebLink
Consent Agenda Item <br />INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: March 31, 2019 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: Terry Southard, Operations Manager <br />Subject: Work Order No. 12 with Kimley Horn for Design, Procurement and Construction <br />Administration to Replace the Degasifier/Scrubber Blower (Odor Control <br />System) at the South County Water Treatment Plant <br />DESCRIPTIONS AND CONDITIONS: <br />Indian River County Department of Utility Services (IRCDUS) operates the South County RO Water <br />Treatment Plant (WTP) located at 1550 9th Street SW, Vero Beach. <br />A condition assessment of the facility was conducted recently by Arcadis as a part of the County's asset <br />management program. During this assessment, it was found that the Degasifier/Scrubber Blower (Odor <br />Control System) was found to be in poor condition due to environmental corrosion, and is recommended <br />for replacement. <br />ANALYSIS: <br />In February 2019, staff requested Kimley Horn submit a proposal for professional engineering services to <br />remedy the Degasifier Scrubber Blower Replacement at the South County Water Plant. <br />Per the Continuing Consulting Engineering Services Agreement for professional engineering services dated <br />April 17, 2018, Kimley-Horn submitted a proposal for design, bidding assistance and construction <br />management services. Kimley-Horn has submitted Work Order No. 12, which includes providing <br />professional services for design, specifications/bid documents, and construction observation in relation <br />to the Degasifier/Scrubber Blower Replacement at the South County WTP. The total negotiated cost for <br />the professional services is a sum amount of $ 29,937. <br />The engineer's estimated construction cost for these improvements covered in the Scope of Work for <br />Work Order No. 12 is approximately $130,000.00. Construction will be budgeted in Fiscal Year (FY) <br />2019/2020. <br />FUNDING: <br />Funds for this project are derived from the renewal and replacement budget in the operating fund. <br />Operating funds are generated from water and sewer revenues. <br />Description <br />Account Number <br />Amount <br />SWWTF Odor Control Equipment Replacement <br />47123536-044699-19519 <br />$29,937.00 <br />9 <br />