My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
04/09/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:20:25 PM
Creation date
5/29/2019 4:02:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATE FOR ENGINEERING SERVICES <br />1 . 1 <br />PROJECT: Degasifier Blower Replacement - South Oslo Rd. Membrane Treatment Plant 1 1 <br />2/19/2019 <br />CLIENT: Indian River County Utilities <br />1 1 <br />ESTIMATOR JRL(MDM Rev) <br />DESCRIPTION: <br />DIRECT LABOR ( MAN-HOURS ) <br />Membrane Replacement, Condition Assessment, <br />REG <br />Dir Exp <br />LINE <br />TOTAL <br />Preparation of Drawings & Bidding <br />PRINC <br />SIN <br />PROF <br />PROF <br />JUFH <br />DES/ <br />P2 (TS/NB) <br />CLK <br />P1 <br />EXP <br />SUB <br />NO. <br />TASK <br />1 <br />Review Blower Types <br />Manufacturer Coordination <br />1 <br />4 <br />6 <br />72 <br />$1,527 <br />Collect/review record information <br />1 <br />4 <br />10 <br />93 <br />51,968 <br />Site Visit - collect dimensional data <br />4 <br />4 <br />51 <br />$1,071 <br />$4,566 <br />2 <br />Prepare Dral+.ings <br />Prepare drawings (5) <br />2 <br />16 <br />40 <br />352 <br />$7,402 <br />Specs for Blower and FRP Duct <br />2 <br />8 <br />8 <br />124 <br />$2,614 <br />6 copies of fmal drawings <br />2 <br />4 <br />4 <br />55 <br />$1,159 <br />$11,175 <br />3 <br />Bidding Phase <br />Assist with advertisement <br />2 <br />4 <br />2 <br />62 <br />$1,304 <br />Respond to contractor questions <br />2 <br />4 <br />2 <br />62 <br />51,304 <br />Evaluate bids and make recommendations for award <br />2 <br />4 <br />2 <br />62 <br />$1,304 <br />$3,912 <br />4 <br />Construction Phase <br />Preconstruction meeting <br />4 <br />4 <br />51 <br />$1,071 <br />Response to RAIs <br />2 <br />15 <br />$315 <br />Shop Drawing Review <br />6 <br />12 <br />108 <br />$2,268 <br />Onsite Observations <br />4 <br />16 <br />114 <br />$2,394 <br />Witness Operational Testing <br />2 <br />4 <br />- 8 <br />94 <br />$1,984 <br />Review of O&Ms <br />4 <br />30 <br />$630 <br />Punchlist <br />1 <br />6 <br />4 <br />77 <br />$1,622 <br />$10,284 <br />TOTAL HOURS <br />0 <br />15 <br />80 <br />116 <br />10 <br />0 <br />51,422 <br />529,937 <br />$29,937 <br />LABOR ($/HOUR) <br />235 <br />225 <br />150 <br />105 <br />96 <br />$0 <br />50 <br />SUBTOTAL <br />0 <br />3375 <br />12000 <br />12180 <br />960 <br />0 <br />528,515 <br />50 <br />K:\WPB_Civil\044572030 - IRCU Oncall\Oslo Degas Blower Replacement\Oslo WTP Degas Blower Rep 3.27.19.docx <br />Page 5 of 5 <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.