My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
04/09/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:20:25 PM
Creation date
5/29/2019 4:02:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Indian River County Lagoon Management Plan Outline April 2019 <br />2.0 PLAN GOALS AND OBJECTIVES <br />This plan seeks to identify reasonable objectives and measurable goals for actions to Revitalize the IRL. The <br />objectives for this first phase of the plan are more general in nature until the Research can determine scientific - <br />based goals necessary to Revitalize the IRL. The second phase, or first update to the plan, ill occur within three <br />to five years of phase one and will include specific and measurable goals. These goals ill include regulatory <br />requirements for nutrient load allocations, in accordance with the TMDLs and BMAP, •ut'will go further in the <br />evaluation of the legacy loads and ecological damage within the IRL as a result of eutro• ication and other aspects <br />of human interaction. <br />2.1 RESEARCH <br />Research is needed to identify impacts and strategically target key items for "evitalization of the lagoon. This <br />first phase of the plan focuses heavily on this action, and the Research wil elp to direct the specific goals and <br />objectives of the second phase of the plan. Research topics, goals, and •bjectives'include: <br />• Monitoring and Data Collection Needs: <br />o Phase 1 Objective: Identify existing monitoring nes ork and -survey information in the County's <br />section of the IRL to determine data gaps and s -cific targets for location and type of monitoring <br />needed. Prepare a monitoring plan with clear - to quality objectives and implement the plan. <br />o Phase 2 Objective: Use the available data d additional data gathered through the monitoring <br />plan to identify necessary water quality i • rovement recommendations and associated projects <br />that will provide such improvements. U - the collected data to track the progress and <br />effectiveness of the County's Lagoon ., Ian efforts. <br />• Hydrology and Hydrodynamics: <br />o Phase 1 Objective: Work with the water control and special districts to identify the natural <br />hydroperiod (flow regime) of th lagoon, water management control structures, available models, <br />and effects of enhanced circ ation. <br />o Phase 2 Objective: Provid- models to show effects of modifying the IRL and IRL watershed <br />hydrology and hydrodyn- ics within Indian River County. <br />• Muck: <br />o Phase 1 Objective: aluate existing database information to identify the location, areal <br />coverage, and nutr -nt flux rates for muck in Indian River County. Evaluate if there are important <br />data gaps that m be filled with additional surveys. <br />o Phase 2 Objec <br />dredging and/ <br />mitigation pr <br />• Biodiversity: <br />o Phase 1 •bjective: Identify current and historical populations and population trends for native and <br />non-na ve species, including fisheries, through land use mapping. Assess trends in the natural <br />com nity structure and coverage. <br />o Phase 2 Objective: Prepare and implement a plan for habitat management strategies to create <br />an Revitalize habitat, and evaluate success through population, coverage, and emergence of <br />native species. <br />e: Prepare a cost/benefit assessment and prioritization schedule for the <br />r capping of muck deposits to evaluate the need and efficiency of future muck <br />jects. <br />OTETRA TECH 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.