My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
04/09/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:20:25 PM
Creation date
5/29/2019 4:02:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Indian River County Lagoon Management Plan Outline April 2019 <br />7.0 PLAN PROGRESSION <br />The Lagoon Management Plan will be implemented in two phases to entify the Research needs; select the <br />projects required to Reduce nutrients inputs; Revitalize the naral IRL systems; Rally public support, <br />understanding, and funding for long-term lagoon Revitalization; an 'Respond to the changing lagoon system. <br />This first phase of the plan is Research focused, and identifie gaps in the existing data, provides new areas of <br />needed Research, and implements well understood cost-effective projects to begin the process to Revitalize the <br />IRL. This process will be long and difficult, given the cur ent state of the IRL and the added pressures of an <br />increasing population, climate change, and limited funds his first phase will provide the science -based approach <br />to efficiently plan and implement projects and program to Revitalize the IRL. <br />The second phase will be a plan revision after thr=to five years. This second phase will use the data collected <br />and lessons learned from this first phase of th- plan to provide an update that is focused on clearly defined <br />objectives with specific measurable goals. Pr.jects will be selected based on their ability to achieve the plan <br />objectives in the most cost-effective manner •ossible. <br />TETRA TECH <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.