Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />8,D. <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br />FROM: Andy P. Sobczak, Infrastructure Project Manager <br />SUBJECT: Award of Bid No: 2019031 <br />IRC North Reverse Osmosis (RO) Plant Roof Replacement <br />1 RC -1802 <br />DATE: March 27, 2019 <br />DESCRIPTION AND CONDITIONS <br />The County's North RO Plant building, located at 7751 58th Avenue, consists of the original main <br />building completed in 1995, and a substantial addition completed in 2007. The roofs on both <br />the older and newer sections of the building are original and show signs of advanced wear and <br />failure in localized areas. To address this issue, the Board of County Commissioners approved <br />Work Order No. 5 with REI Engineers, Inc. in the amount of $23,050.00 to design a roof <br />replacement on May 1, 2018. <br />Following REI's completion of design for the new roof, the project was advertised and a bid <br />opening was held on February 14, 2019. Four (4) qualified bids were received for the project, a <br />detailed tabulation of the bids is on file and available for viewing in the County Engineering <br />Division. The four successful bidders and their respective bids are as follows: <br />Vero Beach Roofing, Inc. <br />Atlantic Roofing 11 of Vero Beach, Inc. <br />Southern Coatings, Inc. <br />The Roof Authority, Inc. <br />$285,740.00 <br />$321,190.00 <br />$455,000.00 <br />$503,588.00 <br />Vero Beach Roofing, Inc. is considered to be the lowest, responsive, responsible bidder for the <br />project with a bid totaling $285,740.00. This bid is $15,740.00 above the engineer's cost <br />estimate of $270,000.00. <br />Upon checking references, County Staff, in coordination with REI Engineers, Inc. staff, has <br />determined that Vero Beach Roofing, Inc. has successfully completed similar construction <br />projects. <br />FUNDING <br />Funding for the IRC North RO Plant Roof Replacement is available in the R & R Account in the <br />Utilities Operating Fund in the amount of $285,740.00. Operating funds are generated from <br />37 <br />