Laserfiche WebLink
Bid No. 2019031/IRC-1802 <br />B. Such Bond shall continue in effect for one (1) year after acceptance of the Work by theOWNER. <br />C. The OWNER shall record the Public Construction Bond with the Public Record Section of the Indian River <br />County Courthouse located at 2000 16th Avenue, Vero Beach, Florida32960. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify and hold harmless the OWNER, and its commissioners, officers, employees, and <br />agents, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, <br />to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the <br />CONTRACTOR and persons employed or utilized by the CONTRACTOR in the performance of the Work. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.1 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the otherrelated data <br />identified in the Ihvitation to Bid documents. C /1 f <br />i \ / : ) 1 I <br />CONTRACTOR havisitedvisited the Site and become;familiar with;an'd is satisfied as to the general;_local,-and Site <br />conditions that rmay affect cost, progress; and/performance of the -Work. <br />----� \ • , \ / r <br />C. CONTRACTOR is familiar with and is satisfied'asto all federal, state, and local Laws and Regulations that may <br />r. a�ffect-cost, progress, and performance of tte Work. <br />/ f I \L 4 1• \ ! + i <br />{ <br />D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all additional <br />or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions <br />(surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, <br />or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, <br />and procedures of construction to be employed by CONTRACTOR, including applying the specific means, <br />methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract <br />Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, <br />or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and <br />in accordance with the other terms and conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that <br />relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations <br />obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional <br />examinations, investigations, explorations, tests, studies, and data with the Contract Documents. <br />Page 27 of 34 <br />42 <br />