My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/09/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
04/09/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:20:25 PM
Creation date
5/29/2019 4:02:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/09/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 8 <br />69th Street Milling & <br />Resurfacing Project <br />Notes: (P) -Preliminary, (S) -Substantially Complete, (F) -Final <br />The final design plans will be prepared in accordance with the Indian River County and <br />Florida Department of Transportation (FDOT) standards to provide all elements necessary <br />to accommodate the scope of work. This effort will include at a minimum; Key Sheet, <br />Typical Section Sheet, General Notes Sheet, Plan and Profile Sheets, Cross Section Sheets, <br />Erosion Control Sheets, Opinion of Probable Construction Cost and other detail sheets as <br />necessary to produce the construction bid plans. <br />The following additional data shall be utilized for development of the plans: <br />1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x <br />17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, <br />temporary construction easements, and centerline of construction. Horizontal <br />control points with state plane coordinates for all PC's, PT's, curve radius, curve <br />length and horizontal Pi's shall be included on the Plan or summarized in an <br />alignment table. <br />3. Signing and Pavement Markings will be included within the Construction <br />Documents. All signing and pavement markings are to be prepared in accordance <br />with the latest design standards and practices (MUTCD), FDOT Standard <br />Specifications, Indexes, and COUNTY standards. <br />Page 2 of 7 <br />73 <br />40% <br />80% <br />100% <br />Cover Sheet <br />P <br />S <br />F <br />Summary of Pay Items <br />P <br />S <br />F <br />Drainage Maps <br />P <br />S <br />F <br />Typical Sections <br />P <br />S <br />F <br />Summary of Quantities & General Notes <br />P <br />S <br />F <br />Project Layout <br />P <br />S <br />F <br />Plan and Profile Sheets (40 scale) <br />P <br />S <br />F <br />Special Details <br />P <br />S <br />F <br />Roadway Soil Survey <br />P <br />S <br />F <br />Cross Sections at 100 ft intervals <br />P <br />S <br />F <br />Stormwater Pollution Prevention Plans <br />P <br />S <br />F <br />Signing & Pavement Marking Plans <br />(40 scale double plan) <br />P <br />S <br />F <br />Construction Cost Estimate and Quantities <br />P <br />S <br />F <br />Notes: (P) -Preliminary, (S) -Substantially Complete, (F) -Final <br />The final design plans will be prepared in accordance with the Indian River County and <br />Florida Department of Transportation (FDOT) standards to provide all elements necessary <br />to accommodate the scope of work. This effort will include at a minimum; Key Sheet, <br />Typical Section Sheet, General Notes Sheet, Plan and Profile Sheets, Cross Section Sheets, <br />Erosion Control Sheets, Opinion of Probable Construction Cost and other detail sheets as <br />necessary to produce the construction bid plans. <br />The following additional data shall be utilized for development of the plans: <br />1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x <br />17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, <br />temporary construction easements, and centerline of construction. Horizontal <br />control points with state plane coordinates for all PC's, PT's, curve radius, curve <br />length and horizontal Pi's shall be included on the Plan or summarized in an <br />alignment table. <br />3. Signing and Pavement Markings will be included within the Construction <br />Documents. All signing and pavement markings are to be prepared in accordance <br />with the latest design standards and practices (MUTCD), FDOT Standard <br />Specifications, Indexes, and COUNTY standards. <br />Page 2 of 7 <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.