Laserfiche WebLink
M MASTELLER & MOLER, INC. 1655 27th Street, Ste. 2, Vero Beach, FL 32960 <br />M - CIVIL ENGINEERS — (772) 567-5300 <br />It should be noted the above-described scope of services does not include any utility adjustment <br />design services for the existing IRCDUS 20" water main and/or force main system on running parallel <br />with 58th Avenue at 45th Street. <br />Fee Schedule: <br />The COUNTY agrees to pay, and the CONSULTANT agrees to accept a lump sum amount for the <br />above-described services as listed below: <br />Task H: Land Surveying <br />Task I: Design <br />Task J: 43rd Utility Design / Permitting <br />Total Lump Sum <br />Time Schedule: <br />Amendment No. 1 shall be completed as follows: <br />A. Task H: Land Surveying <br />B. Task I: Design <br />C. Task J: 43rd Utility Design / Permitting <br />$ 3,000.00 <br />$ 28,500.00 <br />$ 12,000.00 <br />$ 43,500.00 <br />20 Working Days <br />20 Working Days* <br />30 Working Days <br />* Following receipt of Depth Information of NAVD'88 datum. <br />Deliverables — the CONSULTANT shall provide to IRCUD: <br />a. Construction Plans (Preliminary) 11" x 17" & 24" x 36" <br />b. Construction Plans (Final) 11" x 17" & 24" x 36" <br />2 sets <br />2 sets & 1 Digital <br />File#1804 <br />(Y:\mm\Projects\2018\1804 - 45th ST\ADMIN\Contracts\Ammend 1 - Vertical Conflicts\AmendmentNol_19-0402.docx) <br />Page 3 of 3 <br />