My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-079
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:18:40 PM
Creation date
6/3/2019 1:39:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/21/2019
Control Number
2019-079
Agenda Item Number
8.D.
Entity Name
G.K. Environmental, Inc.
Subject
Work Order Number GKE 1
Area
Moorhen Marsh Low Energy Aquatic Plant System (LEAPS)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
geotechnical testing equipment and the second survey shall be shortly before construction <br />begins. Costs: <br />A. First gopher tortoise survey - $1,680 <br />B. Second gopher tortoise survey — $980 <br />C. Gopher tortoise relocation - $1,800 per gopher tortoise. <br />OWNER / CLIENT RESPONSIBILITIES <br />a. All permit submittal fees. <br />b. Preparation of all permit application drawings. <br />c. Preparation of AutoCAD drawings and landscape specifications based on <br />information provided by the CONSULTANT. <br />**END OF ATTACHMENT 1** <br />Page 3 of 5 <br />F:\Public Works\KeithM\Stormwater Projects\LEAPS\Work Orders\Work Order GKE 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.