My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-086
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:20:18 PM
Creation date
6/5/2019 3:10:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/04/2019
Control Number
2019-086
Agenda Item Number
8.M.
Entity Name
Bowman Consulting Group
Subject
Reclaimed Waterline Corrosion Evaluation
Work Order No. 2
Project Number
CCNA2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 - Geotechnical Engineering Services <br />1. Perform four -point test method for transient current and take soil samples at 10 locations <br />and test soils for corrosive parameters. <br />Task 3 - Pipe Diagnostics (2,500' Limited Inspection Option) <br />1. Inspection platform for live insertion & inspection including acoustic leak detection, visual <br />condition assessment and pipeline tracing. <br />2. 20" x 6" wet tap including excavation and restore excavation. <br />3. Does not include trenching equipment or dewatering. <br />Task 4 - Soft Digs <br />1. Perform 10 soft digs, outside the pavement area, up to 5' deep and exposing 3' — 4' of <br />pipe for visual inspection. <br />2. Coordinate with IRCDUS staff for and our contractor for potential limited excavation of <br />identified external Corrosion locations for closer examination. <br />Task 5 — Corrosion Evaluation <br />1. Assist with field analysis and evaluation of collected information and developing mitigation <br />methods. <br />2. Provide subject matter and historical expertise and research assistance on Corrosion <br />causes or contributors as needed. <br />3. Provide engineering assistance in evaluation of compiled data and drawing conclusions. <br />Task 6 — Excavation Contractor <br />1. Mobilize, excavate and limited dewatering for wet tap, then backfill and compact. Up to <br />two mobilizations to excavate at soft dig locations that identify external corrosion to further <br />evaluate the condition. Excavations are anticipated to be on the order of 5-6' deep and <br />up. to 6'x8' or as required for stabile slopes. Dewatering is anticipated to be 57 stone in <br />the excavation with trash pump as dewatering by rule, then backfill and compact <br />restoration. Limited MOT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.