My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-090
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:30:42 PM
Creation date
6/17/2019 11:08:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Plan
Approved Date
06/11/2019
Control Number
2019-090
Agenda Item Number
10.A.1.
Entity Name
IRC Comprehensive Plan 2030 (with RESO 2019-041)
Subject
Text Amendments for Capital Improvements and Transportation
Text of amendments sent to state and regional authority for approval before adoption
Document Relationships
2019-041
(Agenda)
Path:
\Resolutions\2010's\2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Transportation Element <br />terms, the 1,522 crashes resulted in a rate of .012. Approximately 2% of all crashes in 2005 resulted <br />in a fatality. <br />2030-2040 Long Range Transportation Plan <br />In 20052015, the MPO completed its 2030-2040 Long Range Transportation Plan (LRTP) update. <br />As was the case in previous plans, the MPO identified both future deficiencies on the road <br />network and a cost affordable set of improvements needed to accommodate future demand. <br />According to the 2030 2040 LRTP, the vast majority of roadways are expected to operate at LOS <br />"D" or better in 20342040, with the majority actually operating at LOS "B" or above. A small <br />number of roadways, however, are expected to operate below LOS "D." These are shown on <br />Table 4.7 and include Indian River Boulevard (Merrill Barber Bridge - Royal Palm Point); SR <br />A1A (17th Street - Vero Beach City Limits); parts of US 1 in the City of Sebastian and in the <br />City of Vero Beach; and the Wabasso Causeway. <br />In the course of developing the 2030 2040 LRTP update, the MPO identified roadway projects <br />that were underway or expected to be completed within five years of adoption of the LRTP. <br />These projects, known as committed roadway projects, were added to the inventory of existing <br />roadway projects in Indian River County to form the Existing plus Committed (E+C) roadway <br />network. The E+C roadway network deficiencies can be found in Table 1 and in Figure 4.2, <br />while proposed new roadway improvement projects can be found in Figure 4.8. <br />In the 2030 2040 Cost Feasible Plan, major planned roadway improvements include -the <br />.► <br />Avenue (26th-Street-te-Laeonia <br />construction of a new interchange at Oslo Road <br />and 1-95; the widening of 66th Avenue (49th Street - CR 510); the widening of CR 510 (CR 512 - <br />66th Avenue); the construction of 82"d Avenue (69th Street - CR 510); the widening of Oslo Road <br />(58th Avenue - 1-95); the widening of US 1 (53'd Street = CR 510); and the construction of 82"d <br />Avenue (26th Street - 69th Street). <br />Community Development Department Indian River County <br />APPENDIX A - Transportation Amendments <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.