Laserfiche WebLink
A TRUE COPY <br />pkr OC�RK ON LAST PAGE <br />Financial Project ID (s): 431759-1-4B/42/43/45-01 <br />Photographs shall be taken the day prior to the start of construction and continue <br />as needed throughout the project. Photographs shall be taken the days of <br />Substantial Completion and Final Acceptance. <br />Provide visual documentation of the Project through the periodic collection of a <br />set of panoramic digital photographs at predetermined stations throughout the <br />project. Photographic locations should be located at intervals such that the digital <br />photographs collectively portray the majority of the visible surfaces on the Project. <br />The digital photographs should be taken with a frequency designed to reveal <br />changes in the progress of the Project, which can be compared to other project data <br />including daily reports of construction and scheduling updates. Photographic data <br />files comprising each digital photograph are to be supplied together with an HTML <br />(web page) based access and display system for viewing the photographs. Original <br />photographic data files are to be supplied for archival purposes and comprise <br />photographic data identical in form and content to that produced by the digital <br />camera used to capture the image. Working photographic data files are to be <br />supplied for everyday reference purposes and comprise copies of each original <br />photographic data file, which have been processed to a reduced pixel and color <br />resolution (size and clarity) for distribution via CD ROM and the Internet. The <br />access and display system should be comprised of a series of HTML files (web <br />pages) which allow a user to view each photographic data file at random, and in a <br />sequence which simulates the visual experience of a viewer moving through the <br />actual Project from one photographic station to the next. The original photographic <br />data files, working photographic data files and access and display system are to be <br />distributed on CD ROM and portable hard disk media. The working photographic <br />data files and the access and display system should also be maintained on a server <br />accessible via the Internet. <br />9.6 Geotechnical EnEineerina: <br />Stage I, II or III <br />The prime Consultant may engage the services of a geotechnical subconsultant to perform <br />some of the services indicated in this section. However, the prime Consultant will be <br />responsible to Indian River County for the satisfactory performance and timeliness of these <br />services. <br />The prime Consultant will be required to interact with the District Geotechnical Engineer <br />(DGE) office and any geotechnical subconsultant assigned to the project by the DGE office <br />under a District -wide contract. All references to the DGE in the following sections <br />implicitly include the DGE and his/her delegated representative on the project, who may <br />be the DGE office in-house personnel or a subconsultant working for the DGE office. <br />Become familiar with the existing site conditions and the contract documents. Observe <br />and record the progress and quality of foundation work to determine that the foundations <br />are constructed at the correct locations and elevations, identify discrepancies, and direct <br />the Contractor to correct such observed discrepancies. Attend the Preconstruction <br />Conference and/or special geotechnical meeting for the Construction Contract. All services <br />under this section will be performed in accordance to FDOT Specification Section 455. <br />Inspect and verify that ,the Contractor has performed the foundation work in accordance <br />with applicable FDOT Specification Section 455 and other contract documents. Provide <br />qualified Geotechnical Engineers and CTQP qualified inspectors in Drilled Shaft/Pile <br />A- 13 Version 1.0 <br />