A TRUE COPY <br />�CiRn ,F ,11-e'CLEROK LAST PAGE <br />Financial Project ID (s): 431759-1-4B/42/43/45-01 <br />• Observe the performance of any static or statnamic load tests and review the details <br />are implemented as planned. <br />• Evaluate problems encountered during construction and coordinate with the DGE <br />and the Contractor to resolve such problems, including possible additional testing <br />and withdrawing the Pile Installation Plan. <br />3) Spread Footings: <br />• Observe construction of spread footing foundations and verify that they are <br />founded at the required elevation and on the proper soil/rock material. <br />• Verify the Construction Plan requirements and the applicable specifications are <br />followed throughout the spread footing construction. <br />• Evaluate problems encountered during construction and coordinate with the DGE <br />and the Contractor to resolve such problems. <br />4) Auger Cast Piles for Sound Barrier Walls: <br />• Process and review the Auger Cast Pile Installation Plan in accordance with <br />CPAM. <br />• Schedule a pre -pile installation meeting to go over the auger cast pile installation <br />procedures. Make sure the Contractor's field superintendent, CEI's auger cast pile <br />inspectors and the DGE are invited. Prepare and distribute minutes to the attendees. <br />• Observe installation of demonstration pile and production piles. Submit the <br />demonstration pile records to the DGE. Work with the DGE to ensure that the letter <br />of acceptance or recommendations of the production pile installation is issued in <br />accordance with CPAM. <br />• Inspect and verify the requirements on the Construction Plans and applicable <br />specifications are followed throughout the auger cast pile installation. <br />• Cast cylinders for grout strength testing in accordance with the specifications <br />• Complete the FDOT auger cast pile field installation logs and forward them to the <br />DGE upon completion of the auger cast pile installation. <br />• Verify the quality control processes of the Auger Cast Pile Installation Plan are <br />followed during construction. <br />• Examine the records and evaluate problems encountered during construction and <br />coordinate with the DGE and the Contractor to resolve such problems, including <br />possible withdrawing the Auger Cast Pile Installation Plan approval. <br />10.0 PERSONNEL: <br />10.1 General Requirements: <br />Stage I, II or III <br />Provide prequalified personnel necessary to efficiently and effectively carry out its <br />responsibilities under this Agreement. Method of compensation for personnel assigned to <br />this project shall be outlined in Exhibit "B — Lump Sum payment for CCEI Services" <br />Lump Sum costs shall be based upon the assumption of a standard work week as follows: <br />• 7 AM to 5PM Monday through Friday <br />A- 16 Version 1.0 <br />