My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-091
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:32:58 PM
Creation date
6/17/2019 11:32:41 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/11/2019
Control Number
2019-091
Agenda Item Number
12.F.1.
Entity Name
Consor Engineering
Subject
CEI services
Area
43rd Avenue from 18th Street to 26th Street
Project Number
IRC-0853
Bid Number
2019040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />EMI Si -CLARK <br />Financial Project ID (s): 431759-1-4B/42/43/45-01 <br />CEI GEOTECHNICAL TECHNICIAN for Pile Foundations- Qualified CTQP Pile <br />Driving Inspector, knowledgeable in pile installation in conjunction with dynamic load <br />tests with a minimum of three (3) years of experience on at least two (2) Indian River <br />County bridge projects: for projects with Embedded Data Collectors (EDCs), certified <br />EDC monitoring equipment operator. <br />CEI GEOTECHNICAL TECHNICIAN for Drilled Shaft Foundations- Qualified <br />CTQP Drilled Shaft Inspector, knowledgeable in drilled shaft installation with a <br />minimum of three (3) years of experience on at least two (2) Indian River County bridge <br />projects. <br />CEI SENIOR LANDSCAPE INSPECTOR- High School Graduate or equivalent plus <br />eight (8) years of roadway or commercial landscape construction experience, or a Bachelor <br />degree in Horticulture, Urban Forestry, Landscape Architecture plus three (3) years of <br />roadway or commercial landscape construction experience. The individual must be skilled <br />at plant identification, classification, and grades and standards for nursery plants as <br />established by the manual "Grades and Standards for Nursery Plants" by the Florida <br />Department of Agriculture and Consumer Services. The individual must be knowledgeable <br />of current Indian River County methods for landscape and irrigation installation. The <br />individual must have the ability to read and interpret contract documents. For standalone <br />landscape projects, required certification and training includes FDOT Intermediate MOT, <br />FDEP Stormwater Erosion and Sedimentation Control Inspector, and Florida Licensed <br />Landscape Architect or Florida Nursery Growers and Landscape Association (FNGLA) <br />Certified Landscape Contractor. Desired certification and training includes, International <br />Society of Arboriculture (ISA) Certified Arborist, University of Florida Landscape Palm <br />Management Training, and International Society of Arboriculture Advanced Pruning. <br />CEI UTILITY COORDINATOR- High School Graduate or equivalent and be <br />knowledgeable of Indian River County's Standards, policies, procedures, and agreements <br />and shall have a minimum of four (4) years of experience performing utility coordination <br />in accordance with Indian River County's Standards, policies, procedures and agreements. <br />10.3 Staffing: <br />Stage I, II or III <br />Once authorized, the Consultant shall establish and maintain appropriate staffing <br />throughout the duration of construction and completion of the final estimate. Responsible <br />personnel, thoroughly familiar with all aspects of construction and final measurements of <br />the various pay items, shall be available to resolve disputed final pay quantities until Indian <br />River County has received a regular acceptance letter. <br />Construction engineering and inspection forces will be required of the Consultant while <br />the Contractor is working. If Contractor operations are substantially reduced or suspended, <br />the Consultant will reduce its staff appropriately. <br />In the event that the suspension of Contractor operations requires the removal of Consultant <br />forces from the project, the Consultant will be allowed ten (10) days maximum to <br />demobilize, relocate, or terminate such forces. <br />A- 23 Version 1.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.