My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/03/1995
CBCC
>
Meetings
>
1990's
>
1995
>
01/03/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:09 PM
Creation date
6/16/2015 2:09:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/03/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Under discussion, Commissioner Eggert inquired about another <br />possible exit road from the east side of the library once the <br />wastewater treatment plant is removed. <br />Utilities Director Terry Pinto advised that there is a <br />commercial area next to the library that will be developed. <br />Sebastian is not in a position to provide services so the service <br />is being turned over to the County. <br />Commissioner Eggert felt that the City of Sebastian should be <br />reminded that an exit on the east side will be of primary <br />importance once the wastewater treatment plant is removed. <br />Administrator Chandler said that he would investigate the <br />matter with Director Bob Keating and report back to the Board at <br />the next meeting. <br />THE CHAIRMAN CALLED THE QUESTION and the motion <br />carried unanimously. <br />AGREEMENT IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />ARTIFICIAL WETLAND PROTECT <br />. The Board reviewed a Memorandum of December 14, 1994: <br />DATE: DECEMBER 14, 1994 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PI <br />DIRECTOR OF UT SERVICES <br />PREPARED ROBERT O. WISEMEN, P.E <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />J:�o <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: ARTIFICIAL WETLAND PROJECT <br />WORK AUTHORIZATION NO. 2, ADDENDUM NO. 1 <br />INDIAN RIVER COUNTY PROJECT NO. US -93 -05 -DC <br />BACKGROUND <br />On March 16, 1994, the Indian River County Board of County <br />Commissioners approved Work Authorization No. 2 for the subject <br />project for final design, permitting, project advertisement, bidding <br />services, and project administration during construction to <br />Masteller and Moler, Inc. The engineer has diligently pursued all <br />required permits necessary for construction. During this permitting <br />process, the engineer was required to perform many additional <br />services beyond the ordinary services as it was expected. Due to <br />this, the engineer has exceeded his estimated cost for permitting <br />services. The engineer has submitted a proposed invoice (Addendum <br />No. 1) for their services. <br />JANUARY 3, 1995 31 BOOK q PA.. L 3i <br />
The URL can be used to link to this page
Your browser does not support the video tag.