Laserfiche WebLink
1. ENGINEERING <br />$17,262.35 <br />(Based on $2.59/LF) <br />2. CONSTRUCTION <br />$294,351.94 <br />SUB -TOTAL <br />3. ADMINISTRATION <br />$9,348.43 <br />3% OF <br />ENGINEERING <br />& CONSTRUCTION <br />4. 2% TAX COLLECTORS <br />FEE (ENGINEERING <br />$6,232.29 <br />& CONSTRUCTION) <br />5. PERMIT FEES <br />$300.00 <br />6. RECORDING FEE <br />$631.00 <br />SUB -TOTAL <br />TOTAL COST OF PROJECT <br />COST TO BE PAID BY PROPERTY OWNERS $20,554.26 <br />COST TO BE PAID BY MSTU $307,571.75 <br />COST PER F.F. <br />9313EST.WK1 <br />TOTAL L.F. 6,665.00 <br />TOTAL F.F. 10,277.13 <br />$311,614.29 <br />$16,511.72 <br />$328,126.01 <br />21 -Nov -94 <br />