My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-097
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:51:30 AM
Creation date
6/24/2019 1:12:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/18/2019
Control Number
2019-097
Agenda Item Number
8.J.
Entity Name
MBV Engineering Inc
Subject
Jackie Robinson Training Complex Walking Trail (FKA)Historic Dodgertown
Area
Walking Trail
Project Number
IRC-1908
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The COUNTY will be responsible for the above listed permit fees and the Consultant will prepare all <br />necessary applications and provide to COUNTY for signatures. <br />Task 5 — Bidding Phase <br />The COUNTY shall be responsible for setting the providing the front-end bid documents, bid opening <br />date, advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid opening. The <br />Consultant will provide the following: <br />• Preparation of Civil and Structural Plan Documents for Bidding <br />• Attendance at Pre -Bid Meeting (Both Civil and structural representatives will be in attendance) <br />NOTE: All construction specifications will be on the applicable plan sheets in lieu of a specifications <br />manual. The Consultant will prepare a pdf file of the final bid package for the COUNTY's use in <br />distribution to prospective bidders via Demandstar. <br />Task 6 — Construction Phase <br />The Consultant will provide the following scope of services during the construction phase: <br />a. Civil <br />• Attendance at one Pre- Construction meeting <br />• Shop Drawing review of Civil items <br />• Response to Requests for Information <br />• (5) visits during construction <br />• Development and submittal of Certification documents to agencies as required <br />b. Structural <br />• Attendance at one Pre- Construction meeting <br />• Shop Drawing review of Structural items <br />• Response to Requests for Information <br />• (5) visits during construction <br />DELIVERABLES <br />The Consultant shall provide the COUNTY with the following: <br />• Three (3) hard copies in 24" x 36" format of the design plans <br />• One (1) electronic version of the plans in .pdf and CAD format <br />
The URL can be used to link to this page
Your browser does not support the video tag.