Laserfiche WebLink
s <br />III. PROJECT INFORMATION <br />A). Project Description: <br />1. Brief Narrative: <br />Construction of 41st Street and 45th Street from Indian <br />River Boulevard to US 1/SR 5. Both roads exist as unpaved <br />roads serving adjacent groves and will be improved to <br />two (2) lane undivided paved roads with four foot paved <br />shoulders functioning as bicycle lanes. <br />2. Typical Section: <br />Identify Exhibit(s) in Section X - (Other Exhibits Attached). <br />41st Street Figure 1-3 <br />45th Street Figure 1-4 <br />3. Work Phases in Application Project: <br />Construction of Indian River Boulevard from 37th Street to <br />53rd Street has been advertised for bid and construction <br />should be complete by May 1994. Construction of the Boule- <br />vard is not included in this application, it received <br />partial funding under JPA WPA 4125347. <br />This application provides for construction of two (2) <br />east/west connectors, 41st Street and 45th Street, be- <br />tween Indian River Boulevard and US 1. Construction of <br />these east/west connectors is the final phase of the <br />Indian River Boulevard Project. <br />2 <br />