My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-033
CBCC
>
Resolutions
>
1990'S
>
1993
>
1993-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 2:28:04 PM
Creation date
6/27/2019 2:24:23 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1993-33
Approved Date
02/09/1993
Entity Name
Dredging
Subject
Dredging of Fort Pierce
Area
Fort Pierce
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1V. PROJECT ON SYS MC/PLAN <br />A. Application project is included in the current Adopted Work <br />Program? * XX <br />B. Application project is on the State Highway System? XX <br />C. Application project is consistent with the: <br />1. Florida Transportation Plan (+S years)? ' XX <br />2. MPO Transportation Improvement Program? XX " <br />3. Appropriate local government comprehensive plan? X X <br />* WPA Project Identification Number: <br />"Local Government lD #: _Indian River Boulevard Nnrth <br />V. STATEMENT OF BENEFITS <br />EXHIBIT A, attached <br />Attach a narrative identifying the benefits of the project to the State Highway System. <br />Explain how the project will improve traffic flow and reduce congestion of the State <br />Highway System. Provide information on the anticipated level of service, traffic volume in <br />average daily traffic, safety considerations, and structural adequacy (physical condition of <br />facility) for the project. <br />A. STATUS OF PROJECT COSTS <br />EXHIBIT B, attached <br />Attach a current status of project costs which will include both qualifying and non- <br />qualifying phases and their accompanying costs. Total estimated project costs, cost incurred <br />prior to the application date and the balance of costs are to be shown by each category of <br />project or phase. Include in the space provided the estimated fair market value of all donated <br />goods and services. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.