Laserfiche WebLink
Work Order No. 16 <br />Bridge Repairs for C.R. 512 bridges <br />over the St. Sebastian River <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately seven (6) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />3 months following NTP <br />6 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />