My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-099
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:36:24 PM
Creation date
7/5/2019 2:02:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/02/2019
Control Number
2019-099
Agenda Item Number
8.C.
Subject
Bridge Repairs for CR 512 Bridges St Sebastian River
Project Number
Project No. IRC-1727
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 16 <br />Bridge Repairs for C.R. 512 bridges <br />over the St. Sebastian River <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately seven (6) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />3 months following NTP <br />6 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.