My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-102
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:36:59 PM
Creation date
7/5/2019 2:26:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/02/2019
Control Number
2019-102
Agenda Item Number
8.L.
Entity Name
Masteller and Moler Inc.
Subject
Professional Services
Area
Hobart Park Baseball Fields
Project Number
IRC-1759 CCNA2018 Work Order No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M MASTELLER & MOLER, INC. <br />1655 27th Street, Ste. 2, Vero Beach, FL 32960 <br />M — CIVIL ENGINEERS — <br />continued from Page 1 <br />Task <br />Description <br />Task <br />Break down <br />Task <br />Total <br />(772) 567-5300 <br />c. <br />Bidding Assistance <br />Masteller & Moler, Inc. <br />Architectural Sub -Consultant <br />Structural Sub -Consultant <br />Electrical Sub -Consultant <br />Optional: If separate <br />Pre-bid meeting <br />Landscape Sub -Consultant <br />$ 4,000.00 <br />$ 1,870.00 <br />$ 350.00 <br />$ 670.00 (Site) <br />$ 670.00 (Structure) <br />$ 500.00 <br />$ 8,060.00 <br />d. <br />Pre -Construction Conference / Shop Drawing Review <br />Masteller & Moler, Inc. <br />Architectural Sub -Consultant <br />Structural Sub -Consultant <br />Electrical Sub -Consultant <br />Optional: Separate <br />Pre -Construction Meeting <br />Landscape Sub -Consultant <br />$ 2,400.00 <br />$ 720.00 <br />$ 350.00 <br />$ 675.00 (Site) <br />$ 675.00 (Structure) <br />$ 500.00 <br />$ 5,320.00 <br />e. <br />Construction Observation <br />Masteller & Moler, Inc. <br />Architectural Sub -Consultant <br />Structural Sub -Consultant <br />Electrical Sub -Consultant <br />Optional: Separate <br />Construction Observation, <br />Partial Payment Reviews <br />Landscape Sub -Consultant <br />$18,000.00 <br />$ 3,600.00 <br />$ 2,645.00 <br />$ 1,725.00 (Site) <br />$ 1,725.00 (Structure) <br />$ 2,500.00 <br />$ 30,195.00 <br />f. <br />Punchlist Coordination / Certification & Statement of Work <br />Completion <br />Masteller & Moler, Inc. <br />Architectural Sub -Consultant <br />Structural Sub -Consultant <br />Electrical Sub -Consultant <br />Optional: Separate Final <br />Inspection to confirm MEP <br />system is installed & <br />properly working with <br />Engineer's Certification <br />Landscape Sub -Consultant $ 500.00 <br />$ 2,400.00 <br />$ 1,300.00 <br />$ 690.00 <br />$ 1,440.00 (Site) <br />$ 1,440.00 (Structure) <br />$ 7,770.00 <br />Total <br />$ 73,145.00 <br />Excluded: Site Lighting & Irrigation Contract Inspection & Certification <br />File# 1756 <br />(WorkOrder_No1_19-0625.docx) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.