My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
04/23/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:47:21 PM
Creation date
7/9/2019 11:14:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommendation: <br />It is SBS recommendation that IRCDUS plan to construct facilities that will provide for the future <br />demand of at least 3.116 MGD of reuse water to the North Barrier Island. This flow allocation is <br />depicted and listed in Scenario C in the Hydraulic modeling and is summarized as follows: <br />-1.964 MGD - flow to north barrier island communities within IRCDUS service area <br />-1.0 MGD - to JI <br />-0.153 MGD - to COVB service area - the Shores and River Club <br />3.116 MGD total <br />Two system models (C-2 and C-3) that were proposed with this flow allocation are favorable <br />1. With storage and pumps: These flow allocations have been modeled and results indicate <br />that the allocated flows are provided with consistently high pressures with the storage tank <br />and pump capabilities (system model C-2). <br />2. Without storage and pumps: While pressures drop up to 30+- psi at the furthest demand <br />nodes, the same flows can be provided without the tank and pump (system model C-3). <br />This may not be a desirable long-term solution. The burden will be on the Hobart tank and <br />pumping facilities to provide pressurized reuse water to the developments/ communities <br />on the barrier island without a backup or fail safe that the proposed Sea Oaks 3.0 MG <br />Reuse water storage tank provides. <br />The improvements can be phased utilizing both system models C-2 and C-3:. <br />o Phase 1: Limit the construction to just transmission ain and distribution main system <br />components (the pipe network) of system C-2 (and as provided in C-3). <br />o Phase 2: construction of the 3.0 MG reuse storage nk and pumping facilities. IRCDUS <br />will monitor the future growth of the reuse water de a d and decide when to implement <br />Phase 2. <br />'Ts <br />The specific system recommended are the systems 'tied in C-3 and C-2, implemented as a <br />phased project. The system consists of the lowing. <br />• Phase 1 (system C-3): <br />All reuse to the barrier island is fed front o`bartTank and pumps. There is not a new <br />tank or pumps at Sea Oaksthi tim=. Existing 16" transmission line on CR 510 to A -1- <br />A, which feeds the existi Windsor, and feeds both a new 16" line and <br />existing 8" line south to Sea o - s par .lel mains). These parallel lines feed into a new <br />12" line that runs fro, Oaks soarto Old Winter Beach Road. <br />• Phase 2 (syste <br />From the Hobart <a�nn and pu ps, an existing 16" transmission line runs on CR 510 to A- <br />1 -A, which feeds an=Zistir8" line north to Windsor (and Orchid) and feeds a new 16" <br />line south to Sea Oak where reuse will be stored in a new tank (3 MG). A new pump <br />facility will pump the reuse water into the distribution lines, including an existing 8" line <br />which runs north to Disney, and a new 12" new line which routes south to Old Winter <br />Beach Road to feed JI, the Shores and River Club. <br />System C-2 is recommended as a final solution because: <br />• It provides high and consistent pressures throughout its service area. <br />• It relies on the Hobart tank and pumping facilities to deliver pressurized water to Orchid/ <br />Windsor (1.369 MGD), which reduces the volume of reuse water going to and pumped <br />from the new Sea Oaks reuse storage tank and pumping facility to only 1.607 MGD. <br />• The 3.0 MG tank will provide ample storage and buffer for a system with tank capacity at <br />188% of daily flow (*recommended min. storage capacity is equivalent to 100% of daily <br />flow requirement; Dept of Army — Tech manual no. 5-813-4). <br />• 1.607 MGD flow requires a min. 1115 GPM pump capacity (ADF). SBS recommends that <br />the pumping facility mimics that at the existing Hobart reuse storage tank and pumping <br />facility. This system has (1) 250 gpm (at 195 ft.) jockey pump and (3) 850 gpm (at 195 ft.) <br />service pumps. The system is designed to have any two of the three 850 gpm pumps in <br />operation at one time, with a total capacity of 1700 gpm (2.4428 MGD ADF). The additional <br />pump capacity (1700 gpm vs 1115 gpm) provides a buffer for any unanticipated peak <br />demands caused by multiple irrigation systems unexpectantly running simultaneously <br />• The system can provide additional capacity (up to 3.505 MGD - reference model D-2151 <br />1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.