My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
04/23/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:47:21 PM
Creation date
7/9/2019 11:14:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reuse main distribution network which will distribute reuse water to the north and south of <br />Sea Oaks WWTP. <br />The estimated cost of the storage tank, pumps and related infrastructure is: <br />$ 3,053,020.00 (see Appendix A) <br />Additional tasks, including surveying and engineering, permitting, construction observation and <br />inspections, and construction administration are necessary to complete the project. <br />The estimated cost of these additional tasks and fees are: <br />$ 485,875.00 (see Appendix A) <br />)Backaround Information <br />Indian River County owns and operates wastewater treatment plants strategically located <br />throughout the unincorporated areas of the County. These wastewater plants are referred to as <br />the South WWTP, West WWTP, Central WWTP and North P. Currently all of these plants <br />are in operation with the exception of the North County WWTP. The North County WWTP <br />currently functions as a re -pump station with all flows tra smi a the Central WWTP. The North <br />WWTP may be re -activated in the future when wary ted byte sowth of wastewater flows in <br />the North County area. <br />Analysis of Wastewater Treatment Plant Flows: <br />provided the following wastewater treatment 1515 t <br />30, 2018. The information provided indicated the <br />,-mp�7er County Utilities Department staff <br />^ormation for the year ending November <br />owing wastewater treatment plant flows: <br />esign Plant Actual Average <br />Capacity Daily Flow <br />(influent) <br />South WWTP 2.0 MGD 0.780 MGD <br />West WWTP 6.0 MGD 2.125 MGD <br />Central WWTP 4.0 MGD 2.222 MGD <br />North WWTP 1.0 MGD 0.000 MGD* <br />13.0 MGD 5.1 MGD <br />*The North WWTP is currently a repump station and is not treating any flow. <br />Currently, the County disposes of treated effluent from its wastewater treatment plants via its <br />reuse transmission system(s) to its artificial wetland system located at the County's West WWTP <br />site (1.22 MGD), to various golf course and residential developments on the mainland (2.88 <br />MGD), and to several residential developments and one golf course on the North barrier Island <br />(0.58 MGD). <br />153 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.