My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
04/23/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:47:21 PM
Creation date
7/9/2019 11:14:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
from the IRFWCD or other sources or re -allocating the distribution of reuse water. <br />2. Upgrading the Hobart reuse tank and pumping facilities: Currently, approximately 1.367 <br />MGD of Reuse water is pumped to and pumped from the Hobart facility. The Hobart facility <br />has a current pump capacity limited to 1.60 MGD. Only a minimal increase in reuse water <br />demand will require the addition of pump(s) / pump capacity. The estimated existing and <br />future demand from the barrier island for the recommended system is 3.116 MGD. Hobart <br />will need the addition of another 2400 gpm of pumping capacity. <br />‹c's <br />15 <br />165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.