My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
04/23/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:47:21 PM
Creation date
7/9/2019 11:14:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C <br />WaterCAD Model Results <br />Scenario A: This models the current IRCDUS flow allocation (using data from December 2017 to <br />November 2018. (Total flow allocation of 1.097 MGD: current 0.585 MGD flow to north barrier island, and <br />available 0.512 MGD, diverted from the man made wetlands to JI): <br />System A-1: p. EX -01 <br />System A-2: p. EX -02 <br />System A-3: p. EX -03 <br />Scenario B: This models an estimated flow allocation for all current and potential future reuse customers <br />within the IRCDUS service area and additional flow to the John's Island development. The basis of the flow <br />allocation was estimated to be the sum of: the flow allocations of all developments with an existing <br />SJRWMD CUP, plus an estimated flow allocation of 1.0 MGY per c of irrigated area for developments <br />without a SJRWMD CUP, plus 1.0 MGD flow allocation for John's s a d development. (Total flow allocation <br />of 2.964 MGD: estimated 1.964 MGD flow to north barrier islan co nities within IRCDUS service area, <br />and an additional 1.0 MGD to JI): <br />System B-1: p. EX -04 <br />System B-2: p. EX -05 <br />System B-3: p. EX -06 <br />Scenario C: This models the same <br />allocation into the COVB service area fo <br />3.116 MGD: estimated 1.964 M <br />additional 1.0 MGD to JI, and <br />System C-1: p. EX -07 <br />System C-2: p. EX -08 <br />System C-3: p. EX -09 <br />Scenario D: This models the same estimated flow allocation as Scenario C, plus additional flow allocations <br />into the COVB service area until the system failed. The purpose was to estimate the maximum capacity of <br />the transmission and distribution system on the North barrier Island (Additional flows were incrementally <br />increased in each version D-1, D-2 or D-3 below, until the system failed to deliver flows at adequate <br />pressures. Failure was considered to be a pressure below the following: 10 psi at the top of the Wabasso <br />bridge, 15 psi at the Sea Oaks tank, or 5 psi at Windsor). The total flow allocation varies per model below, <br />and included an estimated 1.964 MGD flow to north barrier island communities within IRCDUS service area, <br />additional 1.0 MGD to JI, an additional 0.153 MGD for the Shores and River Club, and additional flow <br />allocation for the COVB service area determined below: <br />location as Scenario 8, plus an additional flow <br />a d River Club developments (Total flow allocation of <br />barrier island communities within IRCDUS service area, <br />MGD to COVB service area - the Shores and River Club): . <br />System D-1: p. EX -10 <br />System D-2: p. EX -11 <br />System D-3: p. EX -12 <br />*See pp. 6-9 for detailed explanation of systems A-1 to A-3, B-1 to B-3, C-1 to C-3, and D-1 to D-1, and see applicable <br />graphics on pp. EX -01 to EX -12 in this appendix. <br />171 <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.