My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
04/23/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:47:21 PM
Creation date
7/9/2019 11:14:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Priority <br />Project Score <br />Project Description <br />Estimated Project <br />Cost & <br />Estimated Time of <br />Completion <br />& <br />Est. Federal Share <br />Applicant/ <br />Responsible Party <br />Mitigation to be Accomplished <br />Hazards <br />Mitigated <br />- <br />Jurisdiction(s) <br />Involved' <br />Possible Funding Sources <br />Date Confirmed/ <br />Added <br />16 <br />79 <br />Retrofits to the City of Vero Beach <br />Public Works facility including roof <br />replacement and hardening of <br />building. <br />$2 million <br />>12 months <br />$1,500,000 <br />City of Vero Beach <br />Don Dexter <br />Reduces the vulnerability to <br />category 4 or 5 hurricanes for <br />two critical facilities. <br />Severe Weather: <br />including Hurricane, <br />Tropical Storm, <br />Tomado, lightning <br />onrl t=lnnd <br />City of Vero Beach <br />HMGP, CDBG, EMP&A Trust <br />Fund (DCA), Pre-disaster <br />Mitigation Program (FEMA), <br />Hurricane Program (FEMA) <br />Confirmed <br />1/16/19 <br />(Don Dexter) <br />17 <br />79 <br />Fleming Street bridge replacement <br />$2 million <br />>12 months <br />$1,500,000 <br />City of Sebastian <br />Paul Carlisle <br />Ensures traffic circulation, <br />emergency response, and <br />public transportation from the <br />city to U.S. #1, C.R. 512, and l- <br />og <br />Hurricane/tropical <br />storm, flooding, and <br />erosion <br />City of Sebastian <br />CDBG, HMGP, EDA <br />Confirmed <br />2/27/19 <br />(Scott Baker) <br />18 <br />79 <br />Replacement of county bridges <br />constructed below the 100-year flood <br />plain for improved access, evacuation <br />and eynncura to flnnrlinn <br />$10 million <br />>12 months <br />$7,500,000 <br />Indian River County <br />Public Works Department <br />Rich Szpyrka <br />Reduces the risk of fatalities <br />(loss of life) during evacuation. <br />Flooding <br />All Jurisdictions <br />CDBG; DRI; Emergency Relief <br />Program; FMAP; HMGP; <br />Hurricane Program; NFMF; STP <br />Confirmed <br />3/1/19 <br />(Rich Szpyrka) <br />19 <br />78 <br />Install flood control structures Vero <br />Isles. <br />$60,000 <br />12 months <br />$45,000 <br />City of Vero Beach <br />Don Dexter <br />Installation will help to minimize <br />tidal flooding of the homes and <br />businesses from the Indian <br />River Lagoon to 8th Avenue in <br />the Miracle Mile and Royal Palm <br />Point sh000ina areas. <br />Flooding, <br />hurricane/tropical <br />storm, tsunami <br />City of Vero Beach <br />HMGP, FDEP <br />Confirmed <br />HMGP <br />1/16/19 <br />(Don Dexter) <br />20 <br />78 <br />Hibiscus Children's Center <br />$575,000 <br /><12 months <br />$431,250 <br />Hibiscus Children's <br />Center/IRCEM <br />Fortification of group home for <br />40 at-risk teenagers to allow <br />shelter-in-place. Harden roofs <br />and install generators. <br />Tropical <br />Storm/Hurricane, <br />Flood <br />Vero Beach <br />HMGP <br />Added <br />2/1/18 <br />(Lisa Wynne) <br />21 <br />75 <br />Protection of the Surticial Aquifer <br />groundwater quality and quantity as a <br />secondary potable water source <br />through acquisition of primary <br />recharge areas and through the <br />plugging of abandoned artesian wells. <br />$2 million <br />>12 months <br />51,500,000 <br />Indian River County <br />Community Development <br />Roland DeBlois <br />Reduces the exposure to <br />potential wellfield contamination. <br />Drought <br />All Jurisdictions <br />Capitalization Grants for <br />Drinking Water State Revolving <br />Fund; Conservation Technical <br />Assistance; DRI; HMGP; <br />Planning Assistance to States <br />Program; Water Pollution <br />Control: State and Interstate <br />Program Support; Water Quality <br />Confirmed <br />1/17/19 <br />(Roland DeBlois) <br />22 <br />77 <br />Laconia Avenue extension <br />$5 million <br />>12 months <br />53,750,000 <br />City of Sebastian <br />Paul Carlisle <br />This project will provide a major <br />emergency evacuation route. <br />that will include a new bridge <br />over the St. Sebastian River. It <br />will provide a much-needed <br />major escape route not directly <br />impacted by the Florida East <br />Cnaat Railway. <br />Flooding <br />Sebastian <br />CDBG, Emergency Relief, <br />FMAP, HMGP <br />Confirmed <br />2/27/19 <br />(Scott Baker) <br />23 <br />74 <br />Culvert/Pipe for Stonecrop Main ditch <br />alignment <br />$500,000 <br /><12 months <br />$375,000 <br />City of Sebastian <br />Paul Carlisle <br />Ensures circulation of storm <br />water system and reduces <br />possible flooding and property <br />damage. <br />Hurricane/tropical <br />storms, flooding, <br />erosion <br />Sebastian <br />HMGP, FMA, SJRWMD, FPMS <br />Confirmed <br />HMGP <br />2/12/19 <br />(Tim Walker) <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.