Laserfiche WebLink
Project Priority <br />Project Score <br />Project Description <br />Estimated Project <br />Cost & <br />Estimated Time of <br />Completion <br />a <br />Est. Federal Share <br />Applicant/ <br />Responsible Party <br />to be Accomplished <br />Hazards <br />Hazards <br />Mitigated <br />Jurisdiction(s) <br />Involved' <br />Possible Funding Sources <br />Date Confirmed/ <br />Added <br />63 <br />Modifications to the outfall structure at <br />$5000 <br />Indian River County <br />Reduces vulnerability to flooding <br />Flood <br />Unincorporated <br />CDBG; DRI; Emergency <br />Confirmed <br />Stonebridge Subdivision for flood <br />>12 months <br />Public Works <br />at this site. <br />Indian River County <br />Rehabilitation of Flood Control <br />3/1/19 <br />32 <br />damage reduction. <br />$3,750 <br />Rich Szpyrka <br />Works; FMAP; HMGP; <br />(Rich Szpyrka) <br />Hurricane Program; NFMF; <br />P,,hlir Aeeinrn <br />33 <br />61 <br />Jones' Pier floodproofing/elevation <br />$800,000 <br /><12 months <br />$600,000 <br />Indian River County <br />Community Development <br />Elevating historic structures to <br />above base flood elevation <br />(BFE); storm shutters; drainage <br />improvements <br />Flooding, <br />Hurricane/tropical <br />storm <br />All Jurisdictions <br />HMGP, DHR <br />Confirmed <br />1/17/19 <br />(Roland DeBlois) <br />59 <br />Restoration of critically eroded areas <br />$18 million initial/ <br />Indian River County <br />Reduces storm surge and . <br />Flood <br />City of Vero Beach <br />CDBG; Conservation Plant <br />Confirmed <br />along an 8.3-mile stretch of the <br />$48 million long-term <br />Public Works Department <br />flooding vulnerability. <br />Material Centers, Conservation <br />3/1/19 <br />Atlantic shoreline in an effort to <br />.>12 months <br />Rich Szpyrka <br />Technical Assistance; DRI; <br />(Rich Szpyrka) <br />34 <br />provide needed storm protection. <br />$13,500,000/ <br />FMAP; HMGP; Hurricane <br />$36,000,000 <br />Program; Land Protection, <br />Planning Assistance to States <br />55 <br />Historic Fellsmere Regional Lakes <br />$2,000,000 <br />12 months <br />City of Fellsmere <br />Jason Nunemaker <br />Will mitigate against future <br />floods by storing flood waters <br />Flood <br />City of Fellsmere <br />HMGP <br />Confirmed <br />7/23/18 <br />35 <br />$1,500,000 <br />within large regional lakes <br />thereby reducing the flood level <br />in the basins served by the <br />ein}nrinn InLne <br />(Jason Nunemaker) <br />48 <br />Historic Fellsmere Alleyway Grading <br />$1,400,000 <br />12 months <br />City of Fellsmere <br />Jason Nunemaker <br />Will mitigate against future <br />floods by storing flood waters in <br />Flood <br />City of Fellsmere <br />HMGP <br />Confirmed <br />Added <br />36 <br />$1,050,000 <br />the alleyways thereby reducing <br />the flood level in the basins <br />served by the alleyway flood <br />7/23/18 <br />(Jason Nunemaker) <br />48 <br />Historic Fellsmere Stormwater <br />Greenway <br />$1,800,000 <br />12 months <br />City of Fellsmere <br />Jason Nunemaker <br />Will mitigate against future <br />floods by storing flood waters in <br />Flood <br />City of Fellsmere <br />HMGP <br />Confirmed <br />Added <br />37 <br />$1,350,000 <br />the stormwater greeway thereby <br />reducing the flood level in the <br />basins served by the stormwater <br />7/23/18 <br />(Jason Nunemaker) <br />14 <br />