Laserfiche WebLink
ARD 1 s <br />:Design & Cvnsulkancy <br />fornaturaland <br />built assets <br />2.6.2 Construction Administration <br />The contractor will prepare shop drawings for the selected equipment and other components of the work <br />as specified in the contract documents. These shop -drawing submittals will be reviewed by the <br />CONSULTANT for compliance with the design concept and contract requirements. The CONSULTANT <br />shall provide a recommendation on the submittal to the OWNER. <br />The CONSULTANT shall also receive and respond to contractor Requests for Information (RFI) or request <br />for clarification of the contract documents or design intent. The CONSULTANT <br />2.6.3 Startup Assistance <br />The CONSULTANT shall assist the OWNER and the contractor during checkout, startup and <br />commissioning. It is anticipated that installation, startup and acceptance will be completed one pump at a <br />time to ensure the facility can remain operational throughout construction. CONSULTANT startup and <br />testing assistance will include presence at startup testing; providing technical guidance during operational <br />confirmation and acceptance testing; and reviewing test data. The CONSULTANT shall be available for a <br />one four-hour day for startup and testing. <br />Review of Contractor Pay Applications is not included in this scope of services. <br />2.7 Task 7 — Post -Construction Activities <br />The CONSULTANT will provide the following services during and subsequent to the completion of the <br />construction: <br />2.7.1 Record Drawings: <br />CONSULTANT will prepare final record drawings from the Contractor supplied "as -built" information. The <br />CONSULTANT provide COUNTY with one PDF set. <br />3 SCHEDULE <br />A preliminary schedule of the work (calendar days from notice to proceed) is summarized below. The <br />schedule is based upon an original notice to proceed (NTP) date of March 25, 2019 and a revised date of <br />June 11, 2019, for the amended scope to go before the County Commission. Design work will still proceed <br />while the scope and fee are reviewed and amended. <br />Table 1. Preliminary Schedule <br />