My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-103
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:38:36 PM
Creation date
7/11/2019 9:49:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/09/2019
Control Number
2019-103
Agenda Item Number
8.N.
Entity Name
Arcadis US
Subject
Procure and administrate rehabilitation of RAS/WAS pumps at central wastewater treatment plant
Amendment 1 to Work order 1
Area
Central Wastewater Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARD 1 s <br />:Design & Cvnsulkancy <br />fornaturaland <br />built assets <br />2.6.2 Construction Administration <br />The contractor will prepare shop drawings for the selected equipment and other components of the work <br />as specified in the contract documents. These shop -drawing submittals will be reviewed by the <br />CONSULTANT for compliance with the design concept and contract requirements. The CONSULTANT <br />shall provide a recommendation on the submittal to the OWNER. <br />The CONSULTANT shall also receive and respond to contractor Requests for Information (RFI) or request <br />for clarification of the contract documents or design intent. The CONSULTANT <br />2.6.3 Startup Assistance <br />The CONSULTANT shall assist the OWNER and the contractor during checkout, startup and <br />commissioning. It is anticipated that installation, startup and acceptance will be completed one pump at a <br />time to ensure the facility can remain operational throughout construction. CONSULTANT startup and <br />testing assistance will include presence at startup testing; providing technical guidance during operational <br />confirmation and acceptance testing; and reviewing test data. The CONSULTANT shall be available for a <br />one four-hour day for startup and testing. <br />Review of Contractor Pay Applications is not included in this scope of services. <br />2.7 Task 7 — Post -Construction Activities <br />The CONSULTANT will provide the following services during and subsequent to the completion of the <br />construction: <br />2.7.1 Record Drawings: <br />CONSULTANT will prepare final record drawings from the Contractor supplied "as -built" information. The <br />CONSULTANT provide COUNTY with one PDF set. <br />3 SCHEDULE <br />A preliminary schedule of the work (calendar days from notice to proceed) is summarized below. The <br />schedule is based upon an original notice to proceed (NTP) date of March 25, 2019 and a revised date of <br />June 11, 2019, for the amended scope to go before the County Commission. Design work will still proceed <br />while the scope and fee are reviewed and amended. <br />Table 1. Preliminary Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.