My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-103
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:38:36 PM
Creation date
7/11/2019 9:49:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/09/2019
Control Number
2019-103
Agenda Item Number
8.N.
Entity Name
Arcadis US
Subject
Procure and administrate rehabilitation of RAS/WAS pumps at central wastewater treatment plant
Amendment 1 to Work order 1
Area
Central Wastewater Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCADIS <br />5 ASSUMPTIONS/EXCLUSIONS <br />tor natural fancy <br />naturaland <br />buitt assets <br />The following text describes the assumptions made in the creation of this scope of services and the <br />estimated engineering services fee for this project. Should the scope of the work of the project exceed these <br />assumptions, the CONSULTANT may request additional fees. Assumptions include: <br />• No permits are required <br />• The COUNTY will provide available record drawing of the existing facilities <br />• Resident Inspection will be performed by the COUNTY or another designated representative. <br />• Verification of construction activities will be performed by the COUNTY or other designated <br />representative. <br />• Construction and field reports will be developed by the COUNTY or other designated <br />representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.