Laserfiche WebLink
The following addenda are hereby acknowledged: <br />Addendum Number <br />1 <br />2019058 - Bid for Jones Pier Residences Repairs -Addendum 1 <br />Date <br />May 7, 2019 <br />ions, and requirements, the Bidder offers the following: <br />3Itmtof llUork,— 7770fJiangle Trail-#Interiorw : llipr <br />t f .,, <br />v,• t M <br />a ., �� <br />1. Lump sum: Removal of existing wood paneling, ceiling mould, baseboards, <br />doors and window casings and inside corner trims <br />$ IGS, <br />2. Lump Sum: Installation of new wood paneling, ceiling mould, baseboards, <br />doors and window casings and inside corner trims <br />$ Z% ck) 7 Li. <br />3. Lump Sum: Cleaning, preparation and painting of all surfaces <br />$ 3 s s .L. <br />4. Lump Sum: Replace all electrical wiring, connections, receptacles and <br />switches <br />$ <br />-5 2-1-10P <br />5. Lump Sum: Replace all plumbing and fixtures <br />$ Oa <br />Total Bid Price - 7770 Jungle Trail - Interior <br />r1 <br />$ %2+ ocz <br />Iteiim of,� . =`7„7c7.0 J:wngle Trail+- 6xteribr' �`' ' 4 i <br />"Rri'ce : -. ^ �t <br />1. Lump sum: Removal of baseboards and corner trims on wood paneling <br />$ %10.4'” <br />2. Lump Sum: Removal of wood paneling under windows on north, south and <br />west walls <br />$ <br />, uo <br />3. Lump Sum: Installation of new wood paneling under windows on north, <br />south and west walls <br />$ 55D* 2.,� <br />4. Lump Sum: Installation of new baseboard and corner trim <br />$vv <br />I <br />5. Lump Sum: Cleaning, preparation and painting of all surfaces <br />$ <br />Total Bid Price— 7770 Jungle Trail - Exterior <br />$ /0,01144, cx� <br />Page 19 of 36 <br />