Laserfiche WebLink
_I <br />Item #13 Widen rolling file trough in room #1177. 805.00 <br />(OWNER) <br />Item #14 Delete wall fabric wall covering in rooms ( 559.00) <br />#2199 and #3204. (ARCHITECT) <br />Item #15 Change wood door #1193 and #1195B to hollow 660.00 <br />metal. (ARCHITECT) <br />Item #16 Delete wall covering and paint east walls -0- <br />in courtrooms. (ARCHITECT) <br />Item #17 Delete cast bronze state seals. (5,120.00) <br />(OWNER) <br />Item #18 Redesign flagpole foundations. 1,408.00 <br />(ARCHITECT) <br />Item #19 Provide electrical power and controls for 2,916.00 <br />CCTV at judge's benches. (ARCHITECT) <br />Item #20 Delete light fixtures at elevator doors. ( 578.00) <br />(ARCHITECT) <br />Item #21 Provide power for well pump not called for 21798.00 <br />in plans. (ARCHITECT) <br />Item #22 Add volume control damper at room #3233. -0- <br />(ARCHITECT) <br />Item #23 Relocate counter in mail room. 286.00 <br />(OWNER - CLERK OF COURT REQUEST) <br />TOTAL ' $26,891.00 <br />New Contract Price is $10,096,299.02 <br />RECOMMMATIONS: <br />Staff recommends Board approval and authorization for the Chairman <br />to execute this Change Order. <br />Gary Glenewenkel, project manager for Centex Rooney, explained <br />Change Orders #15 and #16 (next item on the Agenda). <br />Joe Searci from the architectural firm of Pierce, Goodwin, <br />Alexander, Linville updated the Commission on the overall project, <br />noting that the changes to date, 3 to 5 percent, represent a very <br />small amount in a project of this nature. He also noted that these <br />figures represent an approximate 30% discount from the original <br />proposal. <br />32 <br />January 17, 1995 botlw ywv.19 <br />M M M <br />