My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/17/1995
CBCC
>
Meetings
>
1990's
>
1995
>
1/17/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:09 PM
Creation date
6/16/2015 2:11:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/17/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #2 Electric power to darkroom doors 1,618.00 <br />omitted from plans. (ARCHITECT) <br />Item #3 <br />Relocate electric power from Judge's <br />671.00 <br />vestibules. (ARCHITECT) <br />Item #4 <br />Change disconnect switches in elevator <br />297.00 <br />room as per State Inspector. (ARCHITECT) <br />Item #5 <br />Add 200 volt outlet in room #1214. <br />600.00 <br />(OWNER - CLERK OF COURT REQUEST) <br />Item #6 <br />Add return air registers in third floor <br />-0- <br />lobby. (ARCHITECT) <br />Item #7 <br />Modify masonry window openings on 2nd and <br />4,661.00 <br />3rd floors. (ARCHITECT) <br />Item #8 <br />Add additional disconnect switches <br />778.00 <br />in elevator machine rooms as per State <br />Inspector. (ARCHITECT) <br />Item #9 <br />Remove and reinstall conduit in court <br />1,137.00 <br />rooms to accommodate acoustical panels. <br />(OWNER/ARCHITECT) <br />Item #10 <br />Relocate switches and disconnects <br />303.00 <br />for roof top fans. (ARCHITECT) <br />Item #11 <br />Wrong type fixtures specified for roof- <br />296.00 <br />top exhaust fans. (ARCHITECT) <br />Item #12 <br />Change type grab bars in rooms #2137 <br />261.00 <br />and #3136. (ARCHITECT) <br />TOTAL <br />$11,520.00 <br />New contract price is $10,107.819.02. <br />Staff recommends approval of this change order and request <br />authorization for the Board Chairman to execute same.' <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />Cummings, Inc. Change Order #16 in the amount of <br />$11,520, as recommended by staff. <br />CHANGE ORDER #16 IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />34 <br />January 17, 1995 bony 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.