Laserfiche WebLink
Work Order No. 17 <br />58th Avenue Roadway Improvements <br />Utility Relocation Project <br />TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately three (3) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />2 months following NTP <br />3 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 4 of 5 <br />