My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-108
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:53:04 PM
Creation date
7/23/2019 1:16:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/16/2019
Control Number
2019-108
Agenda Item Number
8.I.
Entity Name
Oslo Road Interchange Utility Improvement Project
Subject
Work Order No. 18
Utility Relocations
Area
Oslo Road & I-95 Interchange
Project Number
413048-2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 18 <br />Oslo Road Interchange Utility <br />Improvement Project <br />The following is the anticipated utility improvement associated within the project limits: <br />1. The utility plan sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" <br />sheets. <br />2. All quantities shall reference FDOT Pay Item Numbers. <br />3. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction and/ or Indian River County Utility Standards. Any deviations or special <br />specifications not included in specifications will be provided in the Technical <br />Specifications. <br />4. It is our understanding that FDOT will provide the currently developed Interchange <br />Constructability Submittal plans along with appropriate digital (.dgn) files to <br />facilitate the proposed utility improvements. <br />The proposed utility improvements will be submitted to the COUNTY for review and <br />comment at Preliminary (30%), Constructability (60%), Biddability (90%) and Production <br />(100%) design submittal stages. Review submittals will consist of three (3) hard copies of <br />utility plans along with an opinion of probable construction cost. It is understood that the <br />Consultant will be required to represent the utility improvements as either reimbursable <br />or non -reimbursable improvements. <br />B. Utility Permit: <br />To support the above described utility improvement, the Consultant will prepare and <br />submit a Florida Department of Environmental Protection (FDEP) Specific Permit to <br />Construct Public Water Systems Components, a FDEP Domestic Waste Water Collection <br />/Transmission System Permit and an IRWCD Application for Utility Construction Permit. <br />Permit agency coordination assumes one (1) request for additional information (RAI) to be <br />received from FDEP and IRFWCD associated with the applications. The Consultant has <br />included the $900 FDEP application fees within the work order fee. The Final Plans will be <br />provided in Autodesk Civil 3D format. <br />It is anticipated that the utility improvement plans will be reviewed and approved by FDOT <br />under their Electronic Review Comment (ERC) System. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.