My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-108
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:53:04 PM
Creation date
7/23/2019 1:16:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/16/2019
Control Number
2019-108
Agenda Item Number
8.I.
Entity Name
Oslo Road Interchange Utility Improvement Project
Subject
Work Order No. 18
Utility Relocations
Area
Oslo Road & I-95 Interchange
Project Number
413048-2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 18 <br />Oslo Road Interchange Utility <br />Improvement Project <br />TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately seven (7) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Preliminary Submittal (30% Design Drawings) <br />Constructability Submittal (60% Design Drawings) <br />Permit Submittal <br />Biddability Submittal (90% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />3months following NTP <br />4 months following NTP <br />4 months following NTP <br />6 months following NTP <br />7 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.