Laserfiche WebLink
Work Order No. 18 <br />Oslo Road Interchange Utility <br />Improvement Project <br />TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately seven (7) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Preliminary Submittal (30% Design Drawings) <br />Constructability Submittal (60% Design Drawings) <br />Permit Submittal <br />Biddability Submittal (90% Design Drawings) <br />Production Submittal (100% Design Drawings) <br />3months following NTP <br />4 months following NTP <br />4 months following NTP <br />6 months following NTP <br />7 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 4 of 5 <br />