My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
05/21/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:00:10 PM
Creation date
7/24/2019 10:42:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL -CHANGE ORDER <br />Schedule of Bid Items Adjustments- FINAL <br />NORTH COUNTY COMMERCIAL SEWER & WATER BID 4/29/19 <br />Indian River County Bid No. 2017046; UCP #4119 <br />Item No. Description Unit Quantity <br />Unit Price <br />Price Increase <br />Price Decrease <br />35 <br />Sample Taps <br />EA <br />5 <br />$ 525.00 <br />$ 2,625.00 <br />39 -DE <br />24" RCP - Remove & Replace <br />LF <br />10.00 <br />$ 1.00 <br />$ 10.00 <br />40 <br />24" CMP - Remove & Replace <br />LF <br />52.00 <br />$ 1.00 <br />$ 52.00 <br />41 <br />24" Mitered End Sections - Remove & Replace <br />EA <br />2.00 <br />$ 1.00 <br />$ 2.00 <br />42 <br />18" RCP - Remove & Replace <br />LF <br />10.00 <br />$ 1.00 <br />$ 10.00 <br />43 <br />18" Mitered End Sections - Remove & Replace <br />EA <br />2.00 <br />$ 1.00 <br />$ 2.00 <br />44 <br />15" RCP - Remove & Replace <br />LF <br />225.00 <br />$ 1.00 <br />$ 225.00 <br />45 <br />12" ADS - Remove & Replace <br />LF <br />80.00 <br />$ 1.00 <br />$ 80.00 <br />46 <br />12" CMP - Remove & Replace <br />LF <br />10.00 <br />$ 1.00 <br />$ 10.00 <br />47 <br />12" Mitered End Sections - Remove & Replace <br />EA <br />3.00 <br />$ 1.00 <br />$ 3.00 <br />48 <br />Remove & Replace (Open Cut) - Pavement Concrete 6" Thick <br />SY <br />49.00 <br />$ 1.00 <br />$ 49.00 <br />49 <br />Remove & Replace (Open Cut) - Pavement Asphalt 2" Thick <br />SY <br />5,797.00 <br />$ 1.00 <br />$ 5,797.00 <br />50 <br />Remove & Replace - (Open Cut) 6" Base Rock <br />SY <br />6,135.00 <br />$ 1.00 <br />$ 6,135.00 <br />51 <br />Remove & Replace - (Open Cut) 8" Stabilized Subgrade <br />SY <br />6,470.00 <br />$ 1.00 <br />$ 6,470.00 <br />53 <br />Curb Replacement (Miami Curb) <br />LF <br />130 <br />$ 1.50 <br />$ 195.00 <br />54 <br />Curb Replacement (Type "F" Curb & Gutter) <br />LF <br />987 <br />$ 1.50 <br />$ 1,480.50 <br />55 <br />Turf Material - Sod (Bahia) <br />SY <br />5,777.78 <br />$ 2.75 <br />$ 15,888.90 <br />WCD-1 <br />Only change in contract time <br />WCD-2 <br />Changes to installation method. Additions & deletions of line <br />items <br />LS <br />1 <br />$ 19,518.48 <br />$ 19,518.48 <br />WCD-3 <br />Addition of 6" Single Sewer Laterals <br />EA <br />4 <br />$ 4,585.00 <br />$ 18,340.00 <br />WCD-4 <br />Additional Sidewalk Repair & Sod <br />LS <br />1 <br />$ 33,449.00 <br />$ 33,449.00 <br />Relocate Fire Hydrant per FDOT request <br />LS <br />1 <br />$ 2,473.00 <br />$ 2,473.00 <br />61 <br />Force Account <br />LS <br />1 <br />$ 200,000.00 <br />$ 200,000.00 <br />SUB -TOTAL: <br />FINAL TOTAL : <br />$ 54,262.00 <br />$ 258,552.88 <br />-$204,290.88 <br />138 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.