Laserfiche WebLink
TASK <br />DESCRIPTION <br />AMOUNT <br />Task 1 <br />Review Existing Information <br />$1,825—t&m <br />Task 2 <br />Develop Sampling/Sorting <br />Protocol <br />$4,390 — t&m <br />Task 3 <br />Sorting Event <br />$21,605 —t&m <br />Task4 <br />Analyze Data and Tech Memo <br />$6,580—t&m <br />TOTAL = <br />$34,400 <br />KCI will perform a five-day WCS at the landfill in the summer of 2019. e scope is targeting four <br />generator sectors: 1) Single Family residential 2) multi -family residenti. 3) commercial / institutional <br />and 4) customer convenience center waste. The study will include at lest 40 loads of waste and a visual <br />audit of approximately 20 loads of bulky waste and construction an. demolition (C&D) debris waste. KCI <br />is estimating a total project time of 12 weeks to complete the pro ct. <br />Since IRC experiences seasonal fluctuations, it is anticipated at a second WCS will be performed next <br />fiscal year to capture the variability of the waste stream a ' d to fully capture the overall composition of <br />the waste going into our landfill. <br />FUNDING: <br />Funding for the Solid Waste Composition Stud is available in the Other Professional Services account in <br />the SWDD Landfill Fund, which is funded fro SWDD assessments and user fees. <br />Description / <br />Account Number <br />Amount <br />Other Professional Se ices <br />41121734-033190 <br />$34,400 <br />RECOMMENDATION: <br />Solid Waste Disposal Distri staff recommends that its Board approve the following: <br />a) Authorize and app <br />provide a solid w <br />ve Work Order No. 1 with Kessler Consulting, Inc. in the amount of $34,400 to <br />ste composition study; <br />b) Authorize th• Chairman to execute the same, as presented. <br />ATTA <br />Work Order No. 1— Kessler Consulting, Inc. <br />@BCL@B80D3F3B.doc <br />147 <br />Page2of2 <br />