My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
05/21/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:00:10 PM
Creation date
7/24/2019 10:42:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />TO: <br />THROUGH: <br />FROM: <br />SU BJ ECT: <br />Jason E. Brown, County Administrator <br />Richard B. Szpyrka, P.E., Public Works Director <br />James W. Ennis, P.E., Assistant Public Works Director <br />Kirstin Leiendecker, P.E., Project Engineer <br />Work Order No. 3 - Atkins North America, Inc. <br />IRC -1712 — Wabasso Fishing Pier Demolition Project <br />DATE: April 25, 2019 <br />DESCRIPTION AND CONDITIONS <br />The Wabasso Fishing Pier was significantly impacted by the passing of Hurricane Matthew in early <br />October 2016, causing approximately 400 LF of the Pier superstructure to be displaced from its <br />substructure and deposited into the Indian River Lagoon south of its previous location. The <br />current condition of the fishing pier causes potential navigation hazards as well as a threat to the <br />surrounding SR -510 Causeway. To address this issue, on December 12, 2017 the Board of County <br />Commissioners approved Work Order No. 6 with Atkins North America Inc. in the amount of <br />$88,932.00 for permitting, construction plans, bidding assistance, and construction administration <br />services for the demolition and deployment of the pier as a new offshore reef. <br />Following Atkins North America, Inc's. completion of design for the demolition of the pier, Board of <br />Commissioners awarded the project on April 9, 2019 to Underwater Engineering Services, Inc. in <br />the amount of $944,824.00. <br />On April 17, 2018, the Board of County Commissioners approved the Continuing Consulting <br />Engineering Service Agreement for Professional Services with Atkins North America, Inc. The <br />purpose of Work Order No. 3 with Atkins North America, Inc. is to provide construction services <br />that will include daily observations of pier removal, review of pier components suitable for reef <br />deployment and review of Contractor's lift plan during the project. The not -to -exceed total for <br />Work Order No. 3 is $44,878.00. <br />FUNDING <br />Funding in the amount of $44,878.00 for Atkins North America, Inc. Work Order No. 3 is available <br />from the Florida Boating Improvement Fund, Hurricane Matthew Account No. 13321072-033490- <br />17001. <br />17 <br />C:\Users\legistar\AppData\Local\Temp\BC L Technologies\easyPDF 8�a,BCL@COOD2A6A\@BCL@COOD2A6Adoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.