My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
05/21/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:00:10 PM
Creation date
7/24/2019 10:42:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/21/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKI N S <br />EXHIBIT A <br />Proposal to Provide <br />Professional Engineering Services <br />for <br />IRC -1712 — Work Order 03 <br />Additional Construction Services <br />Wabasso Fishing Pier Demolition <br />Wabasso, Florida <br />Indian River County (County) has requested continued services in support of the Wabasso Fishing Pier <br />Demolition Project under the terms of the Continuing Contract Agreement for Continuing Engineering <br />Services (dated April 17, 2018). The Wabasso Fishing Pier was significantly impacted by the passing of <br />Hurricane Matthew in early October 2016, causing the loss of 100' from the 525' west span and 300' <br />from the 475' east span. The County has requested an additional scope of services to assist with <br />construction services for the full demolition of the Wabasso Fishing Pier. <br />It is anticipated that the demolition will include the following elements: <br />o West Pier <br />■ Removal of eight intact 50' pier span sections <br />■ Removal of one intact 25' pier span section (at abutment) <br />• Removal of two damaged/displaced/submerged 50' pier span section <br />■ Removal of eleven intact pile pairs with caps <br />• Removal of 150' of upland sidewalk <br />o East Pier <br />• Removal of three intact 50' pier span sections <br />• Removal of one intact 25' pier span section (at abutment) <br />• Removal of six damaged/displaced/submerged 50' pier span section <br />• Removal of five intact pile pairs with caps <br />■ Removal of five damaged/displaced/submerged pile pairs with caps <br />• Removal of 100' of upland sidewalk <br />SECTION 1 SCOPE OF SERVICES <br />CONSTRUCTION SERVICES <br />The Engineer will provide daily observations during removal/lifting of the pier components from their <br />current location (as identified on plan sheets V-102 and V-103), a review of components ready for <br />deployment prior to deployment, and a review of the Contractor's lift plan. <br />The anticipated additional construction services shall include the following tasks: <br />A. Daily Construction Observations — Pier Component Removal <br />The Engineer will conduct daily site visits while pier segments are being removed from the water <br />to observe and document the removal of each required component. Site visits will include <br />observations of the demolition operations from the bridge or adjacent shore. Site visits will not <br />include; observations from on the water or a vessel, diving or underwater observations, or <br />Page 1 of 3 <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.