Laserfiche WebLink
developers and engineering firms seeking review and comment to the proposed 2019 Revisions. A copy of <br />the memo, a fillable comment form, documentation of the revision and the side-by-side proposed revisions <br />were made available on a flash drive for pick-up at our office or on-line at an IRCDUS Drop Box site. The <br />period for public comment ended on March 19, 2019, at 11:00 am. IRCDUS received no comments. <br />The intent and technical integrity of the document provides a minimum standard and serves as a guide for <br />the construction of water, wastewater and reclaimed water utilities. A list of the 2019 revisions is documented <br />in Attachment A. When approved, the revised standards will be posted on the IRCDUS website <br />(www.ircutilities.com) and will be available to the public for review and downloading in a portable document <br />format (PDF). <br />Should there be a need for revisions next year, below is a tentative schedule to be followed for the update: <br />Standards Update Task <br />Schedule <br />Draft of the Updates/Revisions <br />January 2020 <br />Submit of the updates/revisions for comments <br />February 2020 <br />Receive comments <br />April 2020 <br />Submit for BCC approval/adoption <br />May 2020 <br />FUNDING: <br />Funds are not required for the subject task. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners approve adoption of the Indian River County <br />Department of Utility Services Water, Wastewater and Reclaimed Water Construction Standards — May 2019, <br />as presented. <br />ATTACHMENTS: <br />Attachment A — List of Revisions to Standards <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@DOOD5BE3\@BCL@D00D5BE3.docx <br />80 <br />