My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2019
CBCC
>
Meetings
>
2010's
>
2019
>
06/11/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:11:10 PM
Creation date
7/25/2019 9:30:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On short duration CCEI projects (nine (9) months or less), the CCEI shall perform an initial <br />QA review within the first two (2) months of the start of construction. <br />On asphalt projects, the CCEI shall perform an initial QA review on its asphalt inspection <br />staff after the Contractor has completed ten (10) full work days of mainline asphalt paving <br />operations, or 25% of the asphalt pay item amount (whichever is less) to validate that all <br />sampling, testing, inspection, and documentation are occurring as required of the CCEI <br />staff. <br />11.3 Quality Records: <br />Maintain adequate records of the quality assurance actions performed by the organization <br />(including subcontractors and vendors) in providing services and products under this <br />Agreement. All records shall indicate the nature and number of observations made, the <br />number and type of deficiencies found, and the corrective actions taken. All records shall <br />be available to Indian River County, upon request, during the Agreement term. All records <br />shall be kept at the primary job site and shall be subject to audit review. <br />12.0 CERTIFICATION OF FINAL ESTIMATES: <br />12.1 Final Estimate and As -Built Plans Submittal: <br />Prepare documentation and records in compliance with the Agreement, Statewide Quality <br />Control (QC) Plan, or Consultant's approved QC Plan and FDOT's Procedures as <br />required by CPAM and as modified by IRC Procedures. <br />Submit the Final Estimate(s) and one (1) set of final "as -built plans" documenting the <br />Contractor's work in accordance with CPAM & IRC Procedures. <br />Revisions to the Certified Final Estimate will be made at no additional cost to Indian River <br />County. <br />12.2 Certification: <br />Consultant personnel preparing the Certified Final Estimate Package shall be CTQP Final <br />Estimates Level II. <br />Duly authorized representative of the Consultant firm will provide a notarized certification <br />on a form pursuant to Indian River County's procedures. <br />12.3 Offer of Final Payment: <br />Prepare the Offer of Final Payment package as outlined in CPAM. The package shall <br />accompany the Certified Final Estimates Package submitted to the Indian River County <br />Public Works Department for review. The Consultant shall be responsible for forwarding <br />the Offer of Final Payment Package to the Contractor. <br />136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.