Laserfiche WebLink
Financial Project ID (s): 431759-1-4B/42/43/45-01 <br />Photographs shall be taken the day prior to the start of construction and continue <br />as needed throughout the project. Photographs shall be taken the days of <br />Substantial Completion and Final Acceptance. <br />9.6 Geotechnical Engineering: <br />The prime Consultant may engage the services of a geotechnical subconsultant toperform <br />some of the services indicated in this section. However, the prime Consultant will be <br />responsible to Indian River County for the satisfactory performance and timeliness of these <br />services. <br />The prime Consultant will be required to interact with the District Geotechnical Engineer <br />(DGE) office and any geotechnical subconsultant assigned to the project by the DGE office <br />under a District -wide contract. All references to the DGE in the following sections <br />implicitly include the DGE and his/her delegated representative on the project, who may <br />be the DGE office in-house personnel or a subconsultant working for the DGE office. <br />Become familiar with the existing site conditions and the contract documents. Observe and <br />record the progress and quality of foundation work to determine that the foundations are <br />constructed at the correct locations and elevations, identify discrepancies, and direct the <br />Contractor to correct such observed discrepancies. Attend the Preconstruction Conference <br />and/or special geotechnical meeting for the Construction Contract. All services under this <br />section will be performed in accordance to FDOT Specification Section 455. Inspect and <br />verify that the Contractor has performed the foundation work in accordance with applicable <br />FDOT Specification Section 455 and other contract documents. Provide qualified <br />Geotechnical Engineers and CTQP qualified inspectors in Drilled Shaft/Pile <br />Stage I, II or III B- 13 Version 111 <br />