My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2019
CBCC
>
Meetings
>
2010's
>
2019
>
06/11/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:11:10 PM
Creation date
7/25/2019 9:30:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2019 -0220 -TRF -EI <br />DOCKET NO. 20190034 -EI <br />PAGE 8 <br />FLORIDA POWER & LIGHT COMPANY <br />Attachment A <br />Page 1 of 2 <br />Original Sheet No. 8.845 <br />SUPPLEMENTAL POWER SERVICES RIDER PILOT <br />(OPTIONAL) <br />RATE SCHEDULE: OSP-1 <br />jWAILARLE <br />In all territory served This optional rider ("Rider") is available on a voluntary basis to Customers who desire an alternative sotuce <br />of power supply and/or power conditioning service ("Service') in the event Customers' normal electric supply is disrupted. This <br />Rider shall expire three years from the effective date of this program, unless extended by approval of the FPSC. No new Optional <br />Supplemental Power Services Agreennetts may be executed following the expiration of this Rider. Service under this Rider shill be <br />provided under the terms specified in the Optional Supplemental Power Services Agreements that are outstanding at such time as the <br />Rider expires. <br />APPLICATION' <br />Service is provided through the installation of egtapment by the Company al the Customer's premise, the purpose of which is to meet <br />the Customer's requested scope of Service. In order to met the Service need identified by the Customer, the Companty will conduct an <br />evaluation of Customer requirements and of potential solutions, including the potential need of a detailed professional engineering <br />design Urough a feasibility study. The Company and the Customer may thereafter execute a Residential sir Non -Residential Optional <br />Supplemental Power Services Agreement ("Agreement') which must include a description of the equipment to be installed, the Service <br />to be performed, and the monthly charge for the Sen'ice. Upon receipt of the proposed Agreement from Company, the Customer shall <br />have nn more than ninety (90) days to execute the Agreement. After 90 day's, the proposed Agreement shall be considered expired, <br />unless extended in smiting by the Company. <br />Set we would be at the Customer's request and is not considered by the Company to be usual and customary for (he type of installation <br />to be served <br />LIMITATION OF SERVICE: <br />Installation of Service equipment shall be made only when, in the jndgrnent of the Company, the location and the type of the Service <br />equipment are, and will continue to be econoanital, accessible and viable. The Company will own, operate and maintain lite Service <br />equipment for the term of the Agreement. <br />The Company may, at its option, provide and maintain equipment required by the Customer beyond the point of delivery for standard <br />electric service. In the event that Company agrees to a Customer's request to connect generating equipment on the Company's side of <br />the billing enter, energy provided by such equipment will be billed under the Customer's olhervvise applicable general service rote <br />schedule. <br />J%IONTHLY SERVICE PAYMENT; <br />The Company will design, procure, install, own, operate and provide maintaironce to all equipment included in the detemtination of the <br />Monthly Service Payment. The Monthly Service Payment under this Rider is in addition to the monthly billing determined under Use <br />Customer's otherwise applicable rate schedule and any other applicable charges, and shall be calculated based on the following <br />formula: <br />Monthly Service Payment = Capital Cost + Expenses <br />'Where: <br />Capital Cost shall be levelized over the tens of Service based upon the estimated installed cost ofequipnent times a carrying cast. The <br />carrying cad is the cost of capital, reflecting current capital structure and most recent FPSC-approved return on common equity. <br />Any replacement cost(s) expected to be incurred during the term of Service will also be inducted Any equipment installed by the <br />Company that is ncd necessary to support Service to the customer shall not be included in the Monthly Service Payment <br />Except for fuel expenses, projected expenses will be recovered on a levelized Iasis over the term of Service and may include, but not be <br />Limited to: port -fuel operations and maintenance ocpenscs associated with the installed equipment, administrative and general expenses, <br />depreciation expense, income taxes, and property taxes that will be record al as costs arc inew•red. <br />(Continue on Sheet No. 8.846) <br />Issued by: Tiffany Cohen, Director, Rates and Tariffs <br />Effective: <br />
The URL can be used to link to this page
Your browser does not support the video tag.