My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2019
CBCC
>
Meetings
>
2010's
>
2019
>
06/11/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:11:10 PM
Creation date
7/25/2019 9:30:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Agenda Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: May 28, 2019 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: Terry Southard, Operations Manager <br />Subject: Work Order No. 14 with Kimley Horn for Bulk Acid Tank Replacement at North (Hobart) <br />County Water Plant <br />Descriptions and Conditions: <br />Indian River County Department of Utility Services (IRCDUS) operates the North (Hobart) County RO Water <br />Treatment Plant (WTP) located at 7757 58th Avenue, Vero Beach. <br />Hobart was built in 1998 and expanded in 2007. As part of the 2007 expansion, a 16,000- gallon sulfuric <br />acid tank was installed for daily water production. Typical service life for this type of a tank is 10-15 years. <br />Therefore, the Hobart tank is nearing its useful life and needs to be replaced. <br />Analysis: <br />In April 2019, staff requested Kimley Horn submit a proposal for professional engineering services to <br />review existing tank, piping and provide options for replacement of the tank. As part of the proposal, <br />Consultant will also review acid consumption and the potential for a reduction in usage and subsequent <br />storage capacity. <br />Per the Continuing Consulting Engineering Services Agreement for professional engineering services dated <br />April 17, 2018, Kimley-Horn submitted a proposal for design, bidding assistance and construction <br />management services. Kimley-Horn has submitted Work Order No. 14, which includes professional <br />services for review, design, bidding and construction phase assistance to replace the existing sulfuric acid <br />tank. The total negotiated cost for the professional services is a sum amount of $ 21,710.00. <br />The engineer's estimated construction cost for these improvements covered in the Scope of Work for <br />Work Order No. 14 is approximately $130,000.00. <br />Funding: <br />Funds for this project are derived from the renewal and replacement budget in the operating fund. <br />Operating funds are generated from water and sewer revenues. A request to roll forward the funds to <br />cover any construction not completed by September 30, 2019, will follow at fiscal yearend. <br />Description <br />Account Number <br />Amount <br />NWTF Acid Tank Replacement <br />47123536-044699-19560 <br />$151,710.00 <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.