My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/11/2019
CBCC
>
Meetings
>
2010's
>
2019
>
06/11/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:11:10 PM
Creation date
7/25/2019 9:30:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/11/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will answer questions from contractors regarding the scope of work during the price <br />proposal phase. Consultant will review one set of shop drawings on the tank and piping during <br />the construction phase of the project. <br />TIME SCHEDULE <br />Services for Tasks 1 through 3 are anticipated to be completed within 3 weeks of notice to <br />proceed. Task 4 will be concurrent with project construction and is anticipated to be completed <br />within 6-8 months, depending on contractor's schedule. <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting Engineering <br />Services Agreement for Professional Services dated April 17th, 2018, by and between INDIAN <br />RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley- <br />Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task No. <br />Task <br />Task Fee <br />Task 1 <br />Review Existing Conditions, Phasing Plan <br />$ 3,300 <br />Task 2 <br />Design Plans and Specifications <br />$ 14,360 <br />Task 3 <br />Coordination <br />$ 4,050 <br />TOTAL LUMP SUM FEE <br />$ 21,710 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but may be <br />required depending on circumstances that may arise during the execution of this project. <br />Additional services include, but may not be limited to the following: <br />• Construction phase services not included under this task order, but can be prepared if <br />needed after bidding. <br />• Permitting, including preparation of permit application and supporting information is not <br />believed to be necessary, and therefore not provided. Tank replacement is strictly <br />considered maintenance. <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.