My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/09/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/09/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:35:57 PM
Creation date
8/7/2019 1:29:42 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/09/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Attend a pre-bid meeting and site visit. COUNTY to prepare and publish all addenda and <br />clarifications. <br />2. Prepare draft responses to requests for information from prospective bidders. Prepare responses <br />for addenda to interpret, clarify or expand the contract documents <br />3. CONSULTANT will contact up to two references of the apparent low bid contractor to assess <br />qualifications. <br />4. Prepare a conformed set of drawings and specifications incorporating revisions from addenda <br />during the bidding phase. <br />COUNTY to confirm bids are compliant with the bid requirements. COUNTY to provide compiled <br />Microsoft Excel file with each bidder's cost information. Alternative equipment proposed by potential <br />bidders will not be evaluated by CONSULTANT during the bidding process. <br />Deliverables: <br />• Written responses to questions received during bidding process via email <br />• Bid evaluation letter <br />• Conformed documents (final pdf digitally signed and sealed) <br />2.6 Task 6 Construction Management Services <br />The following construction phase services are predicated on one construction contract with an estimated <br />6 -month construction duration to substantial completion. Full-time onsite observation of construction or <br />resident project representative (RPR) services are not included. <br />2.6.1 Meetings and Site Visits <br />The CONSULTANT shall arrange and lead a construction kickoff meeting, during which the COUNTY, the <br />CONSULTANT and the contractor shall discuss project requirements, define responsibilities, and receive <br />the contractor's plan to complete the work. The CONSULTANT shall conduct up to six 4 -hour site visits <br />during the replacement of the pumps to confirm the work appears to be proceeding in accordance with the <br />design. Upon substantial completion of the work, the CONSULTANT shall conduct a site visit with the <br />Contractor and COUNTY to develop a punch list of outstanding work items. Upon completion of the work, <br />the CONSULTANT shall conduct a final site visit to confirm the work is in conformance with the contract <br />documents. The CONSULTANT shall submit a summary report following each site visit. <br />108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.