My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1995
CBCC
>
Meetings
>
1990's
>
1995
>
1/24/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:09 PM
Creation date
6/16/2015 2:12:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/24/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 95-18 <br />The Chairman thereupon declared the resolution duly passed and <br />adopted this 24 day of January , 1995. <br />Attachment: ASSESSMENT ROLL <br />BOARD OF COUNTY COMMISSIONERS <br />INDIAN RenER COUNTY, FLORIDA <br />By <br />Kne Ma_cht <br />Chairman <br />10TH AVENUE & 10TH COURT WATER LINE REPLACEMENT <br />The Board reviewed a Memorandum of January 18, 1995: <br />0 <br />DATE: <br />TO: <br />FROM: <br />PREPARED <br />AND STAFFED <br />BY: <br />SUBJECT: <br />BACKGROUND <br />JANUARY 18, 1995 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />TERRANCE G.PINT <br />DIRECTOR UTILITYVICES <br />ol <br />H. O <br />NMENTAL ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />10TH AVENUE AND 10TH COURT WATER LINE REPLACEMENT <br />INDIAN RIVER COUNTY PROJECT NO. UW -94 -20 -DS <br />IRC BID NO. 4007; WORK AUTHORIZATION NO. 29 <br />Currently residents on 10th Avenue and 10th Court (north of 8th <br />Street) are being provided water service by a 2" galvanized line <br />installed in rear lot easements. The water received by the <br />residents is of poor quality and reduced pressure due to <br />considerable corrosion of the galvanized lines. <br />ANALYSIS <br />It is proposed to replace the 2" lines with PVC and to relocate the <br />water services to the front (streetside) of the properties. Fire <br />protection will be included. <br />Estimated cost by our in-house contractor is $21,952.04 for labor <br />and $15,080.48 for materials (attached) for a total cost of <br />$37,032.52. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval <br />of the subject replacement project and requests approval of the <br />attached work authorization. <br />JANUARY 24, 1995 62 boa 94 P,�u 193 <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.